Original source · versioned page text
2022-09-12 General Committee Meeting Minutes
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
GENERAL COMMITTEE MEETING MINUTES 12 SEPTEMBER 2022
accordance with drawing number Plan number SK01 Version G dated 23
August 2022 prepared by Wiltshire Stevens Architecture.
20. The dedication must be completed prior to the commencement of the use.
External Works – Emerald Street
21. Emerald Street must be upgraded for the length of its frontage to the
subject site. The works must be undertaken in accordance with an
Operational Works approval and must include in particular:
a. a full width pathway extending from the property boundary to the kerb
and channel.
b. works to transition the new full width pathway to match smoothly with
the existing frontages of the adjoining properties. These works will
extend beyond the frontage of the subject site. The transitions must
be constructed at grades that are in accordance with Council’s
Planning Scheme Policy 5 – Engineering Design Standards – Roads,
Drainage and Earthworks.
c. any necessary relocation or alteration to existing access from
Emerald Street to the adjoining property at 4 Emerald Street must be
undertaken. The type and extent of these works must be in
agreement with the adjoining property owner and clearly shown on
plans submitted for operational works.
d. Any relocation/reinstatement of existing services in the road verge.
These works are to be undertaken at no cost to Council.
Site Access and Driveways
22. A sealed access driveway must be provided from Wimmers Lane to all
parking and manoeuvring areas of the development. The works must be
undertaken in accordance with an Operational Works approval and must
include in particular:
a. a driveway crossover generally in accordance with RS-051 and any
associated addendum.
Car Parking
23. A minimum of 23 car parking spaces and 2 motor cycle spaces must be
provided and marked on the site for the commercial development, and
made available and accessible at all times while the use is open for
business. The works must be undertaken in accordance with an
Operational Works approval and must include in particular:
a. pedestrian routes in accordance with the conditions of this Decision
Notice .
b. 1 disabled parking space within the total.
c. dimensions, crossfalls and gradients in accordance with Australian
Standard AS2890: Parking Facilities.
24. All car parking areas and access driveways must be maintained exclusively
for vehicle parking and manoeuvring and kept in a tidy and safe condition
at all times.
Pedestrian and Bicycle Facilities
25. Pedestrian and bicycle facilities must be provided for the development.
The works must be undertaken in accordance with an Operational Works
approval and must include in particular:
Page 6 of 21
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.