Decision Letter - Change to an Existing Approval - 010.2004.00004386.002 [As Published] · 152004.4386.02
Officer: Mark Lewis
Direct Telephone: (07) 5449 5176
Response Address: PO Box 141, Tewantin QLD 4565
Email: [email protected]
Our Reference: 2004/4386
Your Reference: M1716-08
3 December 2008
Seadream Pty Ltd
CARE Jones Flint & Pike Pty Ltd
PO Box 6
MAROOCHYDORE QLD 4558
Dear Sir / Madam
Change to an Existing Approval
Integrated Planning Act 1997
I refer to your request to make a change to an existing approval. On 2 December 2008 Council
decided your requested changes.
Details of the decision with the consolidated conditions are as follows:
1 APPLICATION DETAILS
Application No: 2004/4386
Street address: 40 Avocet Parade PEREGIAN BEACH
Real property description: LOT: 1 RP: 182297
Planning Scheme: The Noosa Plan
2 DECISION DETAILS
Council on 29 November 2004 decided to issue the following type of approval:-
Development Permit
In relation to your request to extend the currency period for the above development approval,
Council decided to:
A. Extend the relevant period until 29 November 2012.
B. Approve to change condition 2 and renumber original conditions 31 to 35 to appear as
conditions 1 to 5 under Referral Agency Conditions.
C. Issue a Change to an Existing Approval.
3 RELEVANT PERIOD OF APPROVAL
The relevant period for this Development Approval is identified in the Assessment Manager
conditions.
4 ASSESSMENT MANAGER CONDITIONS
1. The lot reconfiguration shall be in accordance with plan M1716-01 dated 20 May 2004 as
submitted by Jones Flint & Pike except as modified herein.
Page 1 of 9
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalFull text of the other 8 pages
Page 2
2004/4386
2. Pursuant to Section 3.5.21(2)(b) of the Integrated Planning Act 1997, the relevant period is
until 29 November 2012 during which time all conditions of this approval must have been
complied with, and the Plan of Survey lodged with the Council for endorsement..
3. In conjunction with the lodgement of the Plan of Survey for Council endorsement, legal
documentation shall be presented to Council and shall be submitted in the correct form with
the fees prescribed in Council's adopted fee schedule.
4. Pursuant to Section 3.7.3(c) of the Integrated Planning Act, all outstanding rates and charges
due and payable to Noosa Council in respect of the lots being reconfigured shall be paid prior
to endorsement of the Plan of Survey.
5. Prior to undertaking any excavation, the person acting on this permit shall contact public utility
service providers to ascertain the location of their underground services.
Vegetation Protection
6. Existing trees on the site and within road reserves are to be retained, except where required to
be removed due to building operations and construction of access.
7. Vehicular pavements within the drip zone of any of the existing trees on site to be retained
shall be designed as a pervious pavement (such as grass paving cells or similar), as this will
allow water that falls on this surface to penetrate to the trees root system. The pavement shall
be constructed so as not to damage the tree or their root system and in this regard temporary
fencing shall be provided around the trees during construction to help protect them.
Plans shall be submitted to the Council for approval that clearly show the type and extent of the
pervious pavement and the temporary fencing prior to obtaining a Development Permit for
Operational Works.
Pathway Contributions
8. A pathway contribution of $492 towards external major pathways, in accordance with Planning
Scheme Policy PSP41 Coastal Major Pathway Contributions, shall be paid prior to Council
endorsement of the Plan of Survey. This amount will be subject to variations in the Consumer
Price Index, All Groups Brisbane from June 2004 until the date of payment.
Park Requirements and Contributions
9. A Park contribution of $2,791 towards the acquisition of additional parkland or the
improvement of existing parkland and facilities in the locality shall be paid prior to Council
endorsement of the Plan of Survey in accordance with Council’s Planning Scheme Policy
PSP24 Park Requirements. This amount will be subject to variations in the Consumer Price
Index, All Groups Brisbane from June 2004 until the date of payment.
Headworks Contributions
10. Contributions shall be paid to Council in accordance with Planning Scheme Policies PSP 28
and PSP 30 on Water Supply Headworks Contributions and Sewerage Headworks
Contributions respectively and at the rates applicable at the time of payment.
An estimate only of the contribution rates as of June 2004 under the current policies is as
follows:-
Water Supply $5,170
Sewerage $5993
TOTAL $11,163
Headworks contributions shall be paid prior to Council endorsement of the Plan of Survey.
Each additional lot shall be assessed as a dwelling house.
Page 2 of 9
Page 3
2004/4386
11. A payment of $4729 shall be made (prior to Council endorsement of the Plan of Survey)
toward future construction of Kerb & Channel including any associated and ancillary work for
the full length of the frontage of the development site. This amount will be subject to variations
in the Consumer Price Index, All Groups Brisbane from June 2004 until the date of payment.
12. Footpath improvements such as topsoiling, grassing, and tree planting are required to the
Avocet Parade frontage of the site in accordance with Planning Scheme Policy PSP1
Landscaping Guidelines. Grass shall be couch, free of weeds.
13. A payment of $2481 shall be made (prior to Council endorsement of the Plan of Survey)
toward the future construction of a 1.2 metre wide concrete path along the full length of the
frontage of the development site. This amount will be subject to variations in the Consumer
Price Index, All Groups Brisbane from June 2004 until the date of payment.
Vehicular Access
14. A 3.0 metre wide concrete driveway shall be constructed within a 4.5 metre wide battleaxe
access strip. All service conduits shall be installed for the full length of the access strip prior to
pavement construction.
Stormwater
15. The applicant shall address stormwater runoff from the upper properties in a manner that does
not adversely affect other properties and the proposed development. The applicant shall
provide pipelines and/or free of obstruction secondary overland flow-path(s) to cater for
stormwater flows affecting the south and west boundaries of the property for all storm events
up to and including a 1 in 100 years Average Return Interval (ARI). Design plans shall be
submitted to Council for approval prior to obtaining a Development Permit for Operational
Works.
16. Where drainage pipelines, sewer and water connections were encroaching onto another
property dedication of inter-allotment easement of a minimum width of 1.5 metres would be
required.
17. All site drainage shall be by means of gravity with pipe grades not less than 1%.
18. The internal drainage pipelines shall cater for 1 in 5 year ARI with provision of a well defined
and free of obstruction overland Secondary Flow Path to cater for storms events up to and
including 1 in 100 years ARI.
19. The stormwater runoff from the access driveway should reach the road level in a controlled
manner and be directed to the nearest stormwater inlet pit ensuring the opposite properties will
not be affected by this runoff particularly during major storms.
Services
20. The site shall be connected to Council’s Water Supply and Sewerage reticulation systems to
the water and Sewerage design guidelines and the requirements of the Manager - Land
Development, at no cost to Council.
21. Each water connection to the water reticulation system shall extend to the property boundary
and be metered. All fees for the supply of water meters shall be paid to the Council.
22. Any alteration of a public utility or other facility necessitated by the development of the land or
associated construction works either internal or external to the site shall be at no cost to
Council.
23. An underground electricity service shall be provided to each lot if not already provided.
In this regard, an approved ENERGEX Electrical Design Consultant shall work in conjunction
with Council’s Manager - Works Support to prepare detailed designs of the electrical proposal.
Page 3 of 9
Page 4
2004/4386
The detailed deigns shall then be submitted to ENERGEX for approval and a copy of their
approval submitted to Council in conjunction with a “Certificate of Electricity Supply for
Proposed Subdivisions” (prepared by an approved ENERGEX Electrical Design Consultant)
prior to Council endorsing the Plan of Survey.
Any agreement with ENERGEX or an approved ENERGEX Electrical Design Consultant shall
be wholly at the applicant’s expense and shall not entail a financial encumbrance on future
purchasers of the proposed lots.
24. The requirements for TELECOMMUNICATION services shall be satisfied in relation to the
provision of new telephone services to the proposed lots. In this regard written confirmation
from an approved telecommunication agency shall be submitted to the Council prior to Council
endorsing the Plan of Survey.
25. Any person acting on this permit shall prevent erosion and sediment export from leaving the
site. Site control measures such as silt fencing, controlled gravel access to the site and
controlled disposal of waste, will be necessary.
In this regard plans detailing the methods of controlling erosion and sediment are required to
be submitted to the Council for approval prior to obtaining a Development Permit for
Operational Works.
26. Any damage caused to any public utility during the course of construction shall be repaired to
Council’s standards and at no cost to Council.
27. Any alteration of any public utility or other facilities necessitated by the development of the
land or associated construction works external to the site shall be at no cost to Council.
28. The transportation of all materials to and from the site shall be undertaken in a manner such
that no particle matter escapes onto a public road. All vehicles carrying materials either to or
from the site shall be covered to prevent materials including dust being windblown from the
vehicle.
29. A Registered Professional Engineer of Queensland shall certify engineering drawings and
specifications for all engineering works, which shall be submitted in conjunction with an
application for a Development Permit for Operational Works.
30. For the following classes of work associated with development, a Development Permit for
Operational Works must be obtained prior to commencement of works relating to that class of
work. The application may combine any or all of these classes of work:-
Access and Carparking.
Stormwater Drainage.
Frontage Works.
Landscaping.
5 REFERRAL AGENCY CONDITIONS
The referral agencies applicable to this application are:
Referral Trigger Referral Status Referral Agency Referral Address
Contaminated Land Unit
Environmental Protection
Contaminated land Concurrence PO Box 155
Agency
Brisbane Qld 4002
A copy of any referral agency conditions is attached.
Page 4 of 9
Page 5
2004/4386
6 APPROVED PLANS/DOCUMENTS
The approved plans for this development approval are listed in the following table:
Plan No. Rev. Plan Name Date
M1716-01 Proposal Plan for Reconfiguration of a Lot 20 May 2004
7 ADVISORY NOTES
The following Advisory Notes are for information purposes only and do not form conditions of
approval:
Council Advice Conditions
Coastal Major Road Network Charge
1. Approval of this development application will trigger an Infrastructure Charge in accordance
with the Coastal Major Road Network Infrastructure Charges Plan for the amount of $5048 and
is subject to variations in the Consumer Price Index, All Groups Brisbane from June 2004 until
the date of payment. An Infrastructure Charge Notice will be issued in accordance with
Chapter 5 of the Integrated Planning Act 1997.
2. Payment via credit card transaction will not be an acceptable method of payment for
development contributions conditioned in this permit or for infrastructure charge notices issued
separately.
EPA – Additional Advice Conditions
A report submitted in accordance with EPA Condition 3 (see Referral Agency Conditions)
may include a plan or plans to remediate part or parts of the site by taking action other than
remedial searching, ie where remedial searching may be unwarranted or impracticable.
Management plans for large developments may provide for investigation and remediation to be
implemented by stages.
Applicants may contact either the EPA’s Contaminated Land Unit on (07) 3224 5644 or the
Defence UXO Project Office on (07) 3332 5193 for details of UXO contractors listed by
Defence.
Aboriginal Cultural Heritage Act 2003
There may be a requirement to establish a Cultural Heritage Management Plan and/or obtain
approvals pursuant to the Aboriginal Cultural Heritage Act 2003 (ACH Act).
The ACH Act establishes a cultural heritage duty of care which provides that: “A person who carries
out an activity must take all reasonable and practicable measures to ensure the activity does not
harm Aboriginal cultural heritage”. It is an offence to fail to comply with the duty of care. Substantial
monetary penalties may apply to individuals or corporations breaching this duty of care. Injunctions
may also be issued by the Land and Resources Tribunal, and the Minister administering the ACH Act
can also issue stop orders for an activity that is harming or is likely to harm Aboriginal cultural
heritage or the cultural heritage value of Aboriginal cultural heritage.
You should contact the Cultural Heritage Co-ordination Unit on 07 3238 3838 to discuss any
obligations under the ACH Act.
8 PROPERTY NOTES
Not Applicable.
9 PRELIMINARY APPROVAL OVERRIDING SCHEME
Not applicable.
Page 5 of 9
Page 6
2004/4386
10 FURTHER DEVELOPMENT PERMITS REQUIRED
Type of Development Permit required Subject of the required Development Permit
Access and Carparking, Stormwater Drainage,
Operational Works
Frontage Works, Landscaping.
11 SELF ASSESSABLE CODES
Not Applicable.
12 SUBMISSIONS
Not applicable.
13 REASONS / GROUNDS FOR APPROVAL DESPITE CONFLICT WITH SCHEME
Not applicable.
14 RIGHTS OF APPEAL
You are entitled to appeal against this decision. A copy of the relevant appeal provisions from the
Integrated Planning Act 1997 is attached.
15 OTHER DETAILS
Please note that an Infrastructure Charge in accordance with the Coastal Major Road Network
Infrastructure Charges Plan has been triggered by the approval of this development application. An
Infrastructure Charge Notice is attached in compliance with Chapter 5 of the Integrated Planning Act
1997.
Should you wish to obtain more information about Council’s decision electronic copies are available
on line at www.sunshinecoast.qld.gov.au, or at Council Offices.
DECISION NOTICE HISTORY
Original Decision Notice 29 November 2004.
Change to an Existing Approval – extension of time - 2 December
2008 with amendment to Condition 2 and renumbering of original
conditions 31 to 35 to appear as conditions 1 to 5 under Referral
Agency Conditions.
Yours faithfully
Mark Lewis
ACTING MANAGER – LAND DEVELOPMENT
Page 6 of 9
Page 7
2004/4386
Referral Agency Conditions
INTEGRATED PLANNING ACT 1997 & 1998 REGULATION
EPA - Contaminated Land Unit Conditions
1. Prior to the commencement of any excavation, earthworks or other soil disturbance associated
with the proposed development of the subject lot/s (the site), that part of the site to be so
worked is to be subjected to investigation and any necessary remediation of UXO
contamination.
2. Any person employed to work on any part of the site that has not been cleared through the
satisfying of the above condition (EPA Condition 1), is to be forewarned in writing by the
applicant. This warning is to explain that information available to the EPA indicates a risk of
residual UXO contamination exists on the site and work, particularly that involving excavation,
earthworks or other soil disturbance, should proceed with due caution. It is to state the
procedure to be followed by any person finding an object suspected of being explosive
ordnance or component thereof:
Do not disturb the object.
Take action, where appropriate, to prevent it being disturbed by another person.
Note its approximate dimensions and general appearance.
Safely and clearly mark its location.
Note the route to its location.
Advise the Police as soon as possible.
3. Prior to the signing and sealing of any plan of survey resulting from the development of the
site, an assessment is to be provided to Noosa Council by the EPA that any lot to which such
plan of survey applies has been remediated or does not need remediation. A report, prepared
in accordance with current guidelines, is to be submitted to the EPA by the applicant on the
investigation and any remediation conducted, including any conducted to satisfy EPA
Condition 1, to provide for such assessment.
4. No gravel, rock, sand or soil is to be removed from the site without the written approval of the
EPA
5. The applicant is to advise, if not the owner of the site, the owner, and any occupier of the site
of the above responsibilities.
Page 7 of 9
Page 8
2004/4386
Appeal Rights
INTEGRATED PLANNING ACT 1997 & 1998 REGULATION
The following is an extract from the Integrated (6) If an application involves assessment against a
Planning Act (Chapter 4). concurrence agency code, appeal rights for submitters
for the application are not available against the part of
Division 8 - Appeals to court relating to the approval that represents the concurrence agency’s
development applications response for the code.
Appeals by applicants Appeals by advice agency submitters
4.1.27.(1) An applicant for a development application 4.1.29.(1) An advice agency may, within the limits of its
may appeal to the court against any of the following- jurisdiction, appeal to the court about the giving of a
(a) the refusal, or the refusal in part, of a development development approval for a development application if-
application; (a) the development application involves impact
(b) a matter stated in a development approval, including assessment; and
any condition applying to the development, and the (b) the advice agency told the applicant and the
identification of a code under section 3.1.6;1 assessment manager to treat its response to the
(c) the decision to give a preliminary approval when a application as a submission for an appeal.
development permit was applied for; (2) The appeal must be started within 20 business
(d) the length of a currency period; days after the day the decision notice or negotiated
decision notice is given to the advice agency as a
(e) a deemed refusal. submitter.
(2) An appeal under subsection (1)(a) to (d) must be Appeals for matters arising after approval given
started within 20 business days (the “applicant’s appeal
(co-respondents)
period”) after the day the decision notice or negotiated
decision notice is given to the applicant. 4.1.30.(1) For a development approval given for a
development application, a person to whom any of the
(3) An appeal under subsection (1)(e) may be started
following notices have been given may appeal to the
at any time after the last day a decision on the matter
court against the decision in the notice-
should have been made.
(a) a notice giving a decision on a request for extension
Appeals by submitters
of the currency period for an approval;
4.1.28.(1) A submitter for a development application may
(b) a notice giving a decision on a request to make a
appeal to the court about-
minor change to an approval.
(a) the giving of a development approval, including any
(2) The appeal must be started within 20 business
conditions (or lack of conditions) or other provisions
days after the day the notice of the decision is given to
of the approval; or
the person.
(b) the length of a currency period for the approval.
(3) Subsection (1)(a) does not apply if the approval
(2) The appeal must be started within 20 business resulted from a development application (superseded
days (the “submitters appeal period”) after the day the planning scheme) that was assessed as if it were an
decision notice or negotiated decision notice is given to application under a superseded planning scheme.
the submitter.
(4) Also, a person who has made a request
(3) If a person withdraws a submission before the mentioned in subsection (1) may appeal to the court
application is decided, the person may not appeal the against a deemed refusal of the request.
decision.
(5) An appeal under subsection (4) may be started at
(4) If an application involves both impact assessment any time after the last day the decision on the matter
and code assessment, appeal rights for submitters are should have been made.
available only for the part of the application involving
impact assessment. Division 9 - Appeals to court about other matters
(5) If an application is processed under section Appeals for matters arising after approval given
6.1.28(2), appeal rights for submitters for the application (no co-respondents)
are available only for the aspects of the development that 4.1.31.(1) A person to whom any of the following notices
would have required public notification under the have been given may appeal to the court against the
repealed Act. decision in the notice-
(a) a notice giving a decision on a request to change or
cancel a condition of a development approval.
1
Section 3.1.6 (Preliminary approval may override local
planning instrument)
Page 8 of 9
Page 9
2004/4386
(b) a notice under section 6.1.442 giving a decision to (c) the decision to give a preliminary approval when a
change or cancel a condition of a development development permit was applied for;
approval. (d) the length of a period mentioned in section 3.5.21
(2) The appeal must be started within 20 business currency period;
days after the day the notice of the decision is (e) a deemed refusal.
given to the person.
(2) An appeal under subsection (1)(a) to (d) must be
(3) Also, a person who has made a request started within 20 business days (the “applicant’s appeal
mentioned in subsection (1)(a) may appeal to the period”) after the day the decision notice or negotiated
court against a deemed refusal of the request. decision notice is given to the applicant.
(4) An appeal under subsection (3) may be started at (3) An appeal under subsection (1)(e) may be started
any time after the last day the decision on the at any time after the last day a decision on the matter
matter should have been made. should have been made.
Appeals against decisions to change approval conditions The Registrar for the Building and Development
under the repealed Act Tribunal may be contacted at the website
4.1.33A.(1) A person who is dissatisfied with a decision http://www.localgovernment.qld.gov.au/
made on an application to change the conditions
attached to an approval given under section 2.19(3)or For Infrastructure Charges Only
section 4.4 of the repealed Act may appeal to the court 4.1.36 Appeals about particular infrastructure
against- charges
(a) the decision; or (1) This section applies to a person who has been
(b) a deemed refusal of the application. given, and is dissatisfied with, an infrastructure charges
notice or a regulated State infrastructure charges notice.
(2) An appeal under subsection (1)(a) must be
started within 20 business days after the day notice of (2) The person may appeal to the court against the
the decision is to be given to the person. notice.
(3) An appeal under subsection (1)(b) may be started (3) The appeal must be started within 20 business days
at any time after the last day a decision on the matter after-
should have been made. (a) if the notice is given because of a development
Appeals against local laws approval or master plan approval-the day the
applicant is given notice of the decision about the
4.1.33B.(1) An applicant who is dissatisfied with a
approval; or
decision of a local government or the conditions applied
under a local law about the use of premises or the (b) otherwise-the day the notice is given to the person.
erection of a building or other structure permitted by the (4) An appeal under this section may only be about-
planning scheme may appeal to the court against the
(a) whether a charge in the notice is so unreasonable
decision or the conditions applied. that no reasonable relevant local government, State
(2) The appeal must be started within 20 business infrastructure provider or coordinating agency could
days after the day notice of the decision is given to the have imposed it; or
applicant.
(b) an error in the calculation of the charge.
For Building Works Only (5) To remove any doubt, it is declared that an appeal
Rights of appeal conferred by Section 4.2.9 of the under this section can not be about the methodology
Integrated Planning Act 1997 as follows: used to establish the charge in the relevant infrastructure
Division 3 – Appeals to tribunals relating to charges schedule or regulated State infrastructure
development applications charges schedule.
Appeals by applicants
4.2.9(1) An applicant for a development application may
appeal to the Building and Development Tribunal against
any of the following-
(a) the refusal, or the refusal in part, of a development
application;
(b) a matter stated in a development approval, including
any condition applying to the development, and the
identification of a code under section 3.1.6;3
2
Section 6.1.44 (Conditions may be changed or
cancelled by assessment manager or concurrence
agency in certain circumstances)
3
Section 3.1.6 (Preliminary approval may override local
planning instrument)
Page 9 of 9
Used in these records