Decision Letter - Change to an Existing Approval - 010.2004.00004386.002 [As Published] · 152004.4386.02
2004/4386
2. Pursuant to Section 3.5.21(2)(b) of the Integrated Planning Act 1997, the relevant period is
until 29 November 2012 during which time all conditions of this approval must have been
complied with, and the Plan of Survey lodged with the Council for endorsement..
3. In conjunction with the lodgement of the Plan of Survey for Council endorsement, legal
documentation shall be presented to Council and shall be submitted in the correct form with
the fees prescribed in Council's adopted fee schedule.
4. Pursuant to Section 3.7.3(c) of the Integrated Planning Act, all outstanding rates and charges
due and payable to Noosa Council in respect of the lots being reconfigured shall be paid prior
to endorsement of the Plan of Survey.
5. Prior to undertaking any excavation, the person acting on this permit shall contact public utility
service providers to ascertain the location of their underground services.
Vegetation Protection
6. Existing trees on the site and within road reserves are to be retained, except where required to
be removed due to building operations and construction of access.
7. Vehicular pavements within the drip zone of any of the existing trees on site to be retained
shall be designed as a pervious pavement (such as grass paving cells or similar), as this will
allow water that falls on this surface to penetrate to the trees root system. The pavement shall
be constructed so as not to damage the tree or their root system and in this regard temporary
fencing shall be provided around the trees during construction to help protect them.
Plans shall be submitted to the Council for approval that clearly show the type and extent of the
pervious pavement and the temporary fencing prior to obtaining a Development Permit for
Operational Works.
Pathway Contributions
8. A pathway contribution of $492 towards external major pathways, in accordance with Planning
Scheme Policy PSP41 Coastal Major Pathway Contributions, shall be paid prior to Council
endorsement of the Plan of Survey. This amount will be subject to variations in the Consumer
Price Index, All Groups Brisbane from June 2004 until the date of payment.
Park Requirements and Contributions
9. A Park contribution of $2,791 towards the acquisition of additional parkland or the
improvement of existing parkland and facilities in the locality shall be paid prior to Council
endorsement of the Plan of Survey in accordance with Council’s Planning Scheme Policy
PSP24 Park Requirements. This amount will be subject to variations in the Consumer Price
Index, All Groups Brisbane from June 2004 until the date of payment.
Headworks Contributions
10. Contributions shall be paid to Council in accordance with Planning Scheme Policies PSP 28
and PSP 30 on Water Supply Headworks Contributions and Sewerage Headworks
Contributions respectively and at the rates applicable at the time of payment.
An estimate only of the contribution rates as of June 2004 under the current policies is as
follows:-
Water Supply $5,170
Sewerage $5993
TOTAL $11,163
Headworks contributions shall be paid prior to Council endorsement of the Plan of Survey.
Each additional lot shall be assessed as a dwelling house.
Page 2 of 9
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Decision Letter - Change to an Existing Approval - 010.2004.00004386.002 [As Published]Related documentApplication case desk ↗
About this file
- File size
- 65 KB (small file)
- File type
No other editions are linked here.