Original source · versioned page text
2017-07-11 P&E Agenda - Attachment 1 to Item 8 - Investigation into Stormwater Pollution from Noosa's Industrial Activities
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
Noosaville-Tewantin Compliance / Non Compliance
16
14
12
10
8
6
Compliance
4
2 Non Compliance
0
Chart 3. Noosaville Tewantin Compliance/ Non Compliance
Noosaville / Tewantin Non Compliance
Smash Repairs/
Spray Painting
8%
Marine Repairs
20%
Engineering Motor Vehicle
4% Work Shop
60%
Plastic
Manufacturing
4%
Wood Production
4%
Chart 4: Breakdown of the non-compliant business in Noosaville, Noosa and Tewantin
As can be seen by Charts 3 and 4 motor vehicle workshops make up the majority of the non-
compliant premises followed by marine repairs.
Investigation into Stormwater Pollution from Noosa’s Industrial Activities Page 14
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.