Original source · versioned page text
2017-07-11 P&E Agenda - Attachment 1 to Item 8 - Investigation into Stormwater Pollution from Noosa's Industrial Activities
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
3.3.3 Fuel Stations (excluding Cooroy and Pomona)
Inspection summary
10 premises inspected
9 premises non-compliant-90%
1 premises compliant-10%
Summary of issues
9 Fuel Stations
o Ensure all stormwater from hardstand is contained and not released to stormwater
o Recent storms show that stormwater containment is inadequate
2 Clean drains
o Have storage tanks pumped out regularly
6 Clean out stormwater drains
3 Clean up litter from around site
o Provide bunding on each side of car and dog wash area
o No stormwater catchment to hard stand requires upgrading
Summary of compliant premises
1 fuel station had no requirements.
Noosaville , Peregian, Tewantin Compliance/Noncompliance
10
9
8
7
6 Compliance
5 Non Compliance
4
3
2
1
0
Fuel Stores
Chart 5: Compliance / Noncompliance of Fuel stations not including Cooroy and Pomona
NB: While the results show that 90% of the fuel stations are non-compliant these breaches were
mainly to in regard to cleaning of drains and litter problems, rather than the release of
hydrocarbons.
Investigation into Stormwater Pollution from Noosa’s Industrial Activities Page 15
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.