Original source · versioned page text
2017-07-11 P&E Agenda - Attachment 1 to Item 8 - Investigation into Stormwater Pollution from Noosa's Industrial Activities
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
Cooroy Non Compliance
Abrasive Blasting
14%
Fuel Stores Motor Vehicle
29% Work Shop
57%
Chart 7: Noncompliance of Cooroy including 2 Fuel Stations
3.3.5 Pomona area (including fuel stations)
Inspection summary
6 premises inspected
4 premises non-compliant - 67%
2 premises compliant - 33%
Summary of issues
2 Fuel Stations
o Repair hard stand
o Clean up all spillages immediately to avoid run off into Stormwater drains
1 Metal Surface Coating
o Clean out stormwater drains
1 Motor Vehicle Workshop
o Bund around perimeter of property at the rear to provide a permanent dedicated area or use
a portable bund to drop and store engines with oil
o Improve site housekeeping, clean all unwanted engines, parts, etc. and litter
o Keep site clean and organised. Cease repairing and storing oily machinery in uncovered
area.
Investigation into Stormwater Pollution from Noosa’s Industrial Activities Page 17
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.