Original source · versioned page text
2017-07-11 P&E Agenda - Attachment 1 to Item 8 - Investigation into Stormwater Pollution from Noosa's Industrial Activities
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
3.3.4 Cooroy area (including fuel stations)
Inspections summary
16 premises inspected
7 premises non-compliant - 44%
9 premises compliant – 56%
Summary of issues
2 Fuel stations
o Not enough roof coverage over hardstand area
o Clean up spillages and pump area to avoid spills of hydrocarbons running into stormwater
o Get site assessment by engineer to design hard stand to avoid spillage of hydrocarbons into
stormwater drains
1 Abrasive blasting
o Sweep back sand blasting material from door
o Clear out storm drains
4 Motor vehicle workshops
Summary of compliant premises
2 Engineering
1 Wood Production
1 Metal Recovery
5 Motor Vehicle Workshops
Cooroy Compliance/ Non Compliance
6
5
4
3
2
Compliance
1
Non Compliance
0
Chart 6: Compliance / Noncompliance of Cooroy including 2 Fuel Stations
Investigation into Stormwater Pollution from Noosa’s Industrial Activities Page 16
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.