Original source · versioned page text
2017-07-11 P&E Agenda - Attachment 1 to Item 8 - Investigation into Stormwater Pollution from Noosa's Industrial Activities
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
Drain from concrete plant flowing into the back Flooded area of Mechanical workshop outside. A
of affected property hoist area rainbow slick indicating hydrocarbons was
observed
Flooded car park where the oil sump and blocked Flooded car park where the oil water sump drains
drains are located are located
Concrete Batching Plants
During a rain event this pond overflows The overflow runs down through wire fence into
drain at back of Motor Mechanic property
Investigation into Stormwater Pollution from Noosa’s Industrial Activities Page 26
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.