Original source · versioned page text
2017-07-11 P&E Agenda - Attachment 1 to Item 8 - Investigation into Stormwater Pollution from Noosa's Industrial Activities
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
View of drain through wire fence Close up of the drain Drain running onto grassed area, then runs into Sediment control measures were erected to another drain which discharges near rear fence prevent concrete residue from leaving the of property property Concrete spill in gutter Gutter after clean-up It is more than likely that each of the concrete batching plants in Noosaville industrial estate could have contributed to the concrete looking milky substance found in drain 2. There was also a large fresh pour of concrete conducted a couple of days before photos were taken on 13th January 2017 This may also have contributed to the concrete looking milky substance found in drain 2, and to the spike in pH, phosphorous and turbidity levels in the water samples taken during the survey. Refer to Charts 11-15. Investigation into Stormwater Pollution from Noosa’s Industrial Activities Page 27
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.