Skip to the record
The only place to find full transcripts.

Original source · versioned page text

2017-07-11 P&E Agenda - Attachment 1 to Item 8 - Investigation into Stormwater Pollution from Noosa's Industrial Activities

of 32

Page text shows just the words. Original shows the document exactly as it was published.

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

3.4.2    Additional issues uncovered during inspections
   The breaking up of roads and gutters especially in the Noosaville Industrial area outside of heavy
    industry where large trucks contribute to the damage.
   The large spoon stormwater drain that runs between properties on Eumundi Noosa Road and
    Project Avenue. Due to the current damaged state of the drain, heavy water flows have caused
    the water membrane to be broken on the back of the Project Avenue buildings which is causing
    problems with flooding of a motor mechanic workshop in Project Avenue. See photos below.
   Many hardstand areas of driveways and yards in many Noosaville industrial sites are ageing and
    the concrete is cracking up and adding to sediment running into drains during heavy rains.




Investigation into Stormwater Pollution from Noosa’s Industrial Activities                    Page 28
Log in to download the original file

2017-07-11 P&E Agenda - Attachment 1 to Item 8 - Investigation into Stormwater Pollution from Noosa's Industrial Activities(PDF, 4MB).pdf · 4.5 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.