Original source · versioned page text
Planning Report No. 62805
4.1.3 Stormwater Management
As demonstrated by the topographical contours shown on the Plan of
Development, Plan No. 62805 prepared by Murray & Associated (Qld) Pty Ltd
and attached at Appendix C of this report, the natural fall of the land results
in stormwater flows running to the riparian area in the middle of the site. Due
to the large lot size of the rural settlement allotments, stormwater is able to
be contained and naturally filtered within the site under this existing
arrangement. The volume of stormwater generated by the proposed
subdivision is minimal and will not adversely impact on adjoining properties.
4.1.4 Waste Management
Adequate room is available along the verge of Jirrima Crescent to facilitate
the placement of waste bins. On-street waste collection is the current method
servicing the subject site and surrounding properties and ensures that waste
vehicles do not need to enter the site and conduct turning manoeuvres.
4.1.5 Services
As mentioned under Section 3.1.7 of this report, the subject site is located
within a rural residential area and is provided with the following infrastructure
services: -
A reticulated supply of electricity;
A reticulated supply of telecommunications;
On-site water supply; and
On-site effluent disposal treatment systems.
Electricity and telecommunication services will be extended to Proposed Lot 1,
and the future dwelling will be serviced by on-site water and on-site effluent
disposal.
9
Planning Report 62805 Murray & Associates (Qld) Pty Ltd June 2020
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.