Original source · versioned page text
Response to Information Request - April 2019 Final
Attached to the e-mail Response to Information Request - RAL18/0023.
setback area. Retention of canopy trees and removal of mid-storey in accordance with
the BMP, with the immediate (southern-most) 20m in this environmental covenant area
to be managed in this manner; and
• it is also proposed to undertake maintenance for any disturbed planted areas for a
period of 24 months following completion of initial planting. Weed control is to form
part of the monitoring and maintenance. It is suggested that the proposed Open Space
Management Concept is acceptable for the ongoing management of the open space
areas throughout the site.
14. Details of how Lot 16 will be accessed.
Response
The Technical Memorandum prepared by Cardno reviewed how Lot 16 will be accessed.
The access location will be a minimum of 6m from the tangent point of the adjacent
intersections in line with Australian Standard 2890.1. Additionally, to ensure driver safety a
minimum sight distance of 45m for a driveway fronting a 50km/hr road is required.
Consequently, the access driveway for Lot 16 is to be a minimum of 45m from adjacent
intersections. The indicated driveway location is shown in Figure 4 (below). This illustrates that
the driveway location is suitably located to ensure sufficient sight distance to adjacent
intersections.
Figure 4 – Indicative Driveway Location (source Cardno Figure 5-1)
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the original