fp ken hicks AND ASSOCIATES 15 January 2008 Our Ref: 0701 43T Your Ref: 2007/32 The Chief Executive Officer Noosa Council PO Box 141 TEWANTIN QLD 4565 Attention: Tracy Arthur Dear Tracy REPRESENTATION ABOUT CONDITIONS DEVELOPMENT APPROVAL FOR MATERIAL CHANGE OF USE AND RECONFIGURING A LOT 88 & 90 GOODCHAP STREET, NOOSAVILLE Further to Council's Decision Notice dated 14 December 2007, the following representation about conditions is made and a Negotiated Decision Notice requested. Conditions 7 & 9 Conditions 7 & 9 require the provision of a minimum 55 bicycles to be provided for the increased floor areas. Having regard to the proposal it appears that bicycle parking provision has been incorrectly calculated and exceeds that required for the use. It appears the bicycle parking requirement has been calculated on the total of the additional use areas proposed rather that the actual maximum use area increase. While the total of the additional use areas proposed is 2140m2 (ie 790m? office, 540m2 medical and 810m? education) the actual maximum use area increase is 1228m2. This maximum use area cannot be exceeded notwithstanding that the additional use areas proposed exceed this area. The purpose of having use areas approved which exceed the actual maximum use area increase is to allow flexibility with uses and tenanting. Similar to carparking calculations for this scenario, the bicycle parking provision should be calculated based on the highest demand uses. Under the Driveways and Carparking Code the highest rate applies to education, being 1 space per 30m?, with office and medical {commercial business) both having a rate of 1 space per 50m?. In this regard based on the actual maximum use area increase of 1228m2 the bicycle parking provision should be calculated as 810m? education divided 30 = 27, plus 418m? commercial business (office/medical) divided 50 = 8, totalling 35 bicycle spaces. Amendment of conditions 7 & 9 is requested to require a minimum of 35 bicycle parking spaces. TOWN PLANNERS | CONSULTING SURVEYORS | URBAN DESIGNERS | PROJECT MANAGERS Ken Hicks & Associates Pty Ltd | Suite 7 Dalton Centre, 1 Newspaper Place, Maroochydore BC QLD 4558, PO Box 6380, Maroochydore BC 4558 P 07 5443 2844 | F 07 5443 7146 | A.C.N.010 278823 | A.B.N. 74 308 405 611
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalFull text of the other 2 pages
Page 2
Condition 10.2 Condition 10.2 requires the “rendered block work up stand adjacent to the driveway ramp” shall not exceed 10 metres above natural ground level. This part of the carpark structure referred to is the lift overrun. The ability to limit the lift overrun to 10 metres in height has been assessed and it considered that a 10.5 metre height will be necessary. Given the location of the lift overrun within the centre of the carpark and as the height will still be lower than the adjoining building the required height of 10.5 metres will not have any detrimental impacts. Amendment of condition 10.2 is requested to allow the lift overrun to have a max building height of 10.5 metres above natural ground level. Condition 15 Condition 15 requires “the operator (Central Queensland University)" to submit a statutory declaration confirming compliance with this condition. While Central Queensland University are the likely operator for the premises, no contract has yet been established and this specific reference in the condition is considered too restrictive on alternative end users. Further, the requirement for a statutory declaration is considered unreasonable and inelevant and was deleted through a representation on a similar condition under file 2006/2435. Amendment of condition 15 to delete reference to Central Queensland University and the requirement for a statutory declaration is requested. Condition 24 Condition 24 requires an underground electricity service to be provided to all parts of Lot 4. The requirement for this service to all parts of Lot 4 is considered unreasonable and irrelevant. The larger part of Lot 4 currently has an underground electricity service. Electricity supply will be extended to the smaller part of Lot 4 when developed. The requirement to provide an underground electricity service to all parts of Lot 4 with the lot reconfiguration is irrelevant given the Lot 4 is a single lot and even though it comprises two parts cannot be separately sold or divided without further lot reconfiguration approval. Provided Lot 4 has an underground electricity service no further requirement is necessary for the lot reconfiguration. Amendment of condition 24 to delete reference to “all parts” is requested. Condition 25 Condition 25 requires all parts of Lot 4 to be serviced by a water supply. The requirement for this service to all parts of Lot 4 is considered unreasonable and irrelevant. The larger part of Lot 4 currently has a water supply service, including a fire hydrant near the pathway adjoining the smaller part of Lot 4. Water supply will be extended to the smaller part of Lot 4 when developed. The requirement to provide all parts of Lot 4 with a water supply service as part of the lot reconfiguration is irrelevant given the Lot 4 is a single lot and even though it comprises two parts cannot be separately sold or divided without further lot reconfiguration approval. Provided Lot 4 has a water supply service no further requirement is necessary for the lot reconfiguration. Amendment of condition 25 to delete reference to “all parts” is requested.
Page 3
Condition 55 Condition 55 requires various infrastructure contributions to be paid. Having regard to the proposal it appears that the infrastructure contributions have been incorrectly calculated and exceeds that required for the use. It appears the infrastructure contributions have been calculated on the total of the additional use areas proposed rather that the actual maximum use area increase. While the total of the additional use areas proposed is 2140m2 (ie 790m? office, 540m2 medical and 810m? education} the actual maximum use area increase is 1228m2. This maximum use area cannot be exceeded notwithstanding that the additional use areas proposed exceed this area. The purpose of having use areas approved which exceed the actual maximum use area increase is to allow flexibility with uses and tenanting. In this regard the infrastructure contribution should be calculated on the actual maximum use area increase of 1228m? and based on the highest demand uses that are proposed. This will then allow any of the other uses to be undertaken having lesser impacts and demands upon Councils infrastructure. While not forming part of the conditions we also request Council to reconsider the Coastal Major Road Network Infrastructure change as noted in advice item 3 on this basis. Amendment of condition 55 (and recalculation of the Coastal Major Road Network Infrastructure change) is requested based on the actual maximum use area increase of 1228m?. We look forward to Councils further consideration of these matters and to the issue of a negotiated decision notice. Should you have any questions with respect to the above, please do not hesitate to contact me direct. Yours faithfully KEN HICKS & ASSOCIATES Scott Sobey DIRECTOR 4
Used in these records
07/0012 - Representations Received [As Published]Related documentApplication case desk ↗
About this file
- File size
- 152 KB (small file)
- File type
No other editions are linked here.