07/0012 - Representations Received [As Published] · 132007.12
Condition 10.2 Condition 10.2 requires the “rendered block work up stand adjacent to the driveway ramp” shall not exceed 10 metres above natural ground level. This part of the carpark structure referred to is the lift overrun. The ability to limit the lift overrun to 10 metres in height has been assessed and it considered that a 10.5 metre height will be necessary. Given the location of the lift overrun within the centre of the carpark and as the height will still be lower than the adjoining building the required height of 10.5 metres will not have any detrimental impacts. Amendment of condition 10.2 is requested to allow the lift overrun to have a max building height of 10.5 metres above natural ground level. Condition 15 Condition 15 requires “the operator (Central Queensland University)" to submit a statutory declaration confirming compliance with this condition. While Central Queensland University are the likely operator for the premises, no contract has yet been established and this specific reference in the condition is considered too restrictive on alternative end users. Further, the requirement for a statutory declaration is considered unreasonable and inelevant and was deleted through a representation on a similar condition under file 2006/2435. Amendment of condition 15 to delete reference to Central Queensland University and the requirement for a statutory declaration is requested. Condition 24 Condition 24 requires an underground electricity service to be provided to all parts of Lot 4. The requirement for this service to all parts of Lot 4 is considered unreasonable and irrelevant. The larger part of Lot 4 currently has an underground electricity service. Electricity supply will be extended to the smaller part of Lot 4 when developed. The requirement to provide an underground electricity service to all parts of Lot 4 with the lot reconfiguration is irrelevant given the Lot 4 is a single lot and even though it comprises two parts cannot be separately sold or divided without further lot reconfiguration approval. Provided Lot 4 has an underground electricity service no further requirement is necessary for the lot reconfiguration. Amendment of condition 24 to delete reference to “all parts” is requested. Condition 25 Condition 25 requires all parts of Lot 4 to be serviced by a water supply. The requirement for this service to all parts of Lot 4 is considered unreasonable and irrelevant. The larger part of Lot 4 currently has a water supply service, including a fire hydrant near the pathway adjoining the smaller part of Lot 4. Water supply will be extended to the smaller part of Lot 4 when developed. The requirement to provide all parts of Lot 4 with a water supply service as part of the lot reconfiguration is irrelevant given the Lot 4 is a single lot and even though it comprises two parts cannot be separately sold or divided without further lot reconfiguration approval. Provided Lot 4 has a water supply service no further requirement is necessary for the lot reconfiguration. Amendment of condition 25 to delete reference to “all parts” is requested.
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
07/0012 - Representations Received [As Published]Related documentApplication case desk ↗
About this file
- File size
- 152 KB (small file)
- File type
No other editions are linked here.