Table 3-5: Bioretention Design Parameters
Parameter Existing Basin Upgraded Basin
Extended Detention Depth (m) 0.30 0.30
Storage Surface Area (m2) 80 130
2
Filter Media Area (m ) 80 130
Unlined Filter Media Perimeter (m) 0.01 0.01
Saturated Hydraulic Conductivity (mm/hr) 200 200
Filter Depth (m) 0.5 0.5
TN Content of Filter Media (mg/kg) 400 400
Orthophosphate Content of Filter Media (mg/kg) 30 30
Exfiltration Rate (mm/hr) 0.0 0.0
Overflow Weir (m) 2 2
3.3.2. Sediment Forebays
To ensure that the deposition of coarse sediment on the filter media surface does not affect its function,
bioretention systems should be designed with pre-treatment to limit the amount of coarse sediment
reaching the filter media. The sediment forebay has been sized in accordance with the WaterByDesign’s
Bioretention Technical Design Guideline. Table 3-6 summarises the proposed design parameters for the
proposed sediment forebay.
Table 3-6: Sediment Forebay Design Parameters
Parameter Value
Site Catchment (ha) 2.645
Min Area of Forebay (m2) 26
Removal Efficiency (%) 80
3.4. Results
MUSIC modelling of the proposed treatment train for the developable area of the development at 25
Pavilion Street, Pomona was performed to ensure the WQO’s were achieved. Table 3-7 presents the load-
based outputs that are represented by this application. As the bioretention basin is treating an external
catchment, the loads generated from the external catchment have been subtracted from the mitigated
loads. The results show the mitigated scenario, which achieves compliant load reductions set out within the
NSC Planning Scheme. Calculations for mitigated loads are shown in Table 3-8.
Table 3-7: MUSIC Results – Load Based Pollutant Outputs
Mitigated
Unmitigated (Less External Reduction Target
Pollutant Compliance
(kg/yr) Catchment) Achieved (%) Reduction
(kg/yr)
TSS 4,660 900 81 80%
TP 9.27 2.38 74 60%
TN 51.8 24.5 53 45%
GP 485.0 0 100 90%
23-0167SMP01-V3 | Stormwater Management Plan | 33 Pavilion Street, Pomona Page 33
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.