Original source · versioned page text
Reference Document - RAL23/0013.02 - Part 2 (As Published)
Very large file (10.7 MB): the original may take a few minutes to open or download. The page text below is quick to read.
Original PDF page 42, section 1. The text section number identifies this passage in the reader.
Table 3-8: MUSIC Results – Portion of total pollutant loads for External Catchment and Site
Total Model Residual External Catchment Site – Mitigated load (less
Pollutant
load (kg/yr) Source Load (kg/yr) external catchment) (kg/yr)
TSS 2190 1290 900
TP 5.3 3.0 2.4
TN 43.5 19.0 24.5
GP 0 153 0
23-0167SMP01-V3 | Stormwater Management Plan | 33 Pavilion Street, Pomona Page 34
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.