Original PDF page 43, section 1. The text section number identifies this passage in the reader.

4. CONSTRUCTION PHASE
   MANAGEMENT
4.1.      Erosion and Sediment Control
The management of the site during the construction phase is an important step in ensuring water quality
standards are achieved. Implementation of best practice Erosion and Sediment Control techniques is
imperative to managing the quality of runoff affected by construction works.

The following points provide general guidance on the management of stormwater during the construction
phase. Detailed Erosion and Sediment Control Management Plans should be developed in conjunction with
the Operational Works design prior to construction works commencing in accordance with the International
Erosion Control Association (IECA) - “Best Practice Erosion and Sediment Control (BPESC) document” and
overseen by a Certified Professional in Erosion and Sediment Control (CPESC) or Registered Professional
Engineer Queensland (RPEQ).

    1.   Establish a single stabilised entry/exit point for the site works;
    2.   Construct a shake-down grid at the entrance to facilitate the removal of sediment from trucks leaving
         the site. The access road extending from the end of existing road or kerb to the grid should comprise
         a 150-200mm deep pad of 40mm crushed rock;
    3.   Install sediment fences along the lower boundaries of the site;
    4.   Construct one or more strategically placed sediment basins in the proposed drainage reserve and
         construct contour drains / bunds to direct disturbed runoff to the sediment basins;
    5.   Install bins and/or wind-proof litter areas on-site to minimise the dispersion of gross pollutants;
    6.   Maintain on site sufficient materials necessary for the emergency repair of all erosion control
         devices. This includes silt fences, clean crushed rock for reapplication to the entrance road and for
         replacement of rock within temporary drainage channels, and flocculants for settling sediment
         basins;
    7.   Following each day’s construction works, ensure that any material on road surfaces is swept from
         the road, and not permitted to be washed down the gutters and piped drainage systems;
    8.   Quality of pooled water within sediment basins are to be monitored prior to dewatering, sufficient
         time should be given to allow sediment to settle (possible with the assistance of a suitable flocculent
         if necessary) &/or filtering during pumping operations; and
    9.   Final establishment of bioretention basin should not occur until full stabilisation of upstream
         catchment has occurred; preferably these should be temporarily turfed during the maintenance
         period while dwelling construction is occurring.

It shall be the responsibility of the developer, through their principal contractor, to ensure that temporary
sediment and erosion controls are installed and maintained correctly.




23-0167SMP01-V3 | Stormwater Management Plan | 33 Pavilion Street, Pomona                              Page 35
Log in to download the original file

Reference Document - RAL23_0013.02 - Part 2 (As Published).pdf · 10.7 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.