ORDINARY MEETING AGENDA 20 NOVEMBER 2014
registered professional engineer and a Development Permit for Operational
Works, and shall include in particular:
A driveway crossover/s in accordance with IPWEAQ standard drawing SEQ R-
051 and to grades that prevent vehicles from scraping and/or bottoming.
For pedestrian safety between vehicles exiting the site and pedestrians on the
footpath, the driveway and any associated fencing or vegetation near the
driveway shall comply with the minimum sight line requirements as defined in
AS 2890.1, section 3.2.4.
All parking spaces, driveways and circulation lane in compliance with the
relevant sections of the current AS 2890.1 and AS2890.2.
Suitable safety measures, including: traffic directional signage, warning signage
and speed limit/s within the site, to improve driver awareness of pedestrians
and enhance pedestrian safety.
Provision of vandal resistant public lighting with intensities to satisfy the
requirements of Australian Standard AS1158: Public Lighting Code
143. All car parking areas and access driveways must be maintained exclusively for
vehicle parking and manoeuvring and kept in a tidy and safe condition at all
times.
Frontage Works - Footpath
1514. Frontage works must be provided for the development. The works must be
undertaken in accordance with a Development Permit for Operational Works
and must include in particular:
a. A two (2) metre wide concrete footpath within the road verge for the entire
length of the site’s frontage to Rene Street in compliance with IPWEAQ
standard drawing SEQ R-065 Concrete Pathway Construction Details.
The footpath must match the levels the driveways to the site without step
or trip hazard. Where necessary existing driveway finish level should be
adjusted to ensure compliance grades for the footpath and driveway.
b. Replacement of any street trees affected by the frontage works.
Stormwater Drainage
165. Prior issue of building works approval for the new building on the eastern
portion of the site, an Operational Works approval for treatment of stormwater
quality must be obtained. The application for Operational Works Approval for
stormwater must provide for treatment of stormwater from the entire site.
176. The stormwater quality treatment system shall be designed and implemented
generally in accordance with “Option 1” presented in the “Site Based
Stormwater Management Plan (4298-1.0) for 66 Rene Street” dated 9 October
2014 by STORMwater Pty Ltd.
187. An ongoing maintenance contract for the stormwater quality treatment devices
must be established and provided to Council prior to commencement of use of
the new building on the eastern portion of the site. The maintenance contract
schedule must be consistent with the manufacturer’s requirements to achieve
an ongoing pollutant reduction efficiency of 80% reduction in Total Suspended
solids, 60% reduction in Total Phosphorous and 45% reduction in Total
Nitrogen in runoff from the site compared to an untreated situation.
198. All copies of stormwater maintenance documentation must be kept for a period
of 5 years and made available to Council officers on request to demonstrate
compliance with the conditions of this approval.
Page 16 of 24