ORDINARY MEETING AGENDA 20 NOVEMBER 2014
Earthworks
1920. Any earthworks required on site shall be carried out in accordance with
Council’s Planning Scheme Policy PSP5 – Engineering Design Standards –
Roads, Drainage and Earthworks and must be undertaken in accordance with a
Development Permit for Operational Works.
210. Earthworks carried out on site shall not affect the structural integrity of any of
the adjoining properties, existing fences or structures that border the
development site. Fences that are affected shall be replaced prior to the
Building Certifier issuing the Certificate of Classification. In this regard any
fences to be replaced shall be clearly shown on the plans submitted for
Operational Works approval.
UNITYWATER
The following Unitywater conditions are applied in accordance with the South East
Queensland (Distribution and Retail) Restructuring Act 2009 and Unitywater’s Interim
Connections Policy. The conditions below form part of a water connection aspect
which are taken to be a water approval for a staged connection. Any future
applications must be made to Unitywater under South East Queensland (Distribution
and Retail) Restructuring Act 2009. Unitywater can be contacted as follows:
Phone: 1300 0 Unity (1300 086 489)
Email: [email protected]
Web: www.unitywater.com
Water & Sewerage
221. Reticulated water supply and sewerage must be provided to the development.
232. Construction activities must not impede the access of Unitywater or Fire
Brigade personnel to vital infrastructure (eg. valves, fire hydrants and sewer
access chambers).
243. The fire-fighting demand on Unitywater’s water supply system from the
development must not exceed 30 litres per second.
254. A single Unitywater installed primary water meter must be provided immediately
inside the property boundary. Meters must be Unitywater approved, installed in
accordance with Unitywater requirements and remain accessible at all times for
reading and maintenance purposes.
265. Water meters must be located on alternative boundaries to electrical pillars.
276. Buildings, basements and other structures must maintain a minimum clearance
of 1.5 meters from Unitywater sewer mains, and 1.0 meter from a sewer
manhole chamber or sewer inspection opening.
287. Easements of between 3 and 10 metres must be provided over all Unitywater
sewers located within property boundaries in accordance with the SEQ
standards. Easements shall be centred over the pipe. Easement terms shall be
the most current registered dealing held by the Department of Natural
Resources & Mines and shall not be altered or amended.
298. Storm water retention systems and gross pollutant traps must maintain a
minimum clearance of 1.5 meters from Unitywater water supply and sewerage
infrastructure.
2930. Tree plantings must maintain a minimum horizontal clearance of 1.0 metre from
Unitywater water mains and 1.5 metres from Unitywater sewerage mains.
Landscaping plants within these clearances must be low growing when mature,
and suitable approved varieties.
Page 17 of 24