310. Construction works undertaken in the vicinity of Unitywater water supply or
sewerage infrastructure must not adversely affect the integrity of the
infrastructure. All costs associated with repair, replacement or alteration of
infrastructure must be met by the applicant.
OPW14/0276 - SIGNAGE CONDITIONS
Approved Plans
1. Development undertaken in accordance with this approval must generally
comply with the approved plans of development. The approved plans are listed
and are as amended by the conditions herein.
Plan No. Rev. Plan/Document Name Date
OGSS-001-06 G Elevations 1 & 2 18/9/14
Sign Size & Total Sign Face Area
2. No sign shall exceed a maximum sign face area of 4m². In this regard, the “Self
Storage” signs, shown as Sign 1 on each building on the approved plan, shall
be reduced in size to comply.
3. The total sign face area for the development shall not exceed 20m2. Any
additional signage to that shown on the approved plan must be removed or
separate written approval obtained from Council.
Location
4. The approved signs must be positioned wholly within the property boundaries of
the subject site, and must not be located within or across any easements.
Illumination
5. Only 1 sign on the site may be illuminated.
6. Illumination resulting from direct, reflected or other incidental light emanating
from a sign must not exceed a luminance of 300 candelas per square metre.
7. All sign illumination must be switched off between 11:00pm and sunset of the
following day.
Advisory Notes
Unitywater
Connection to Unitywater live water mains and the Unitywater live sewer system must
be undertaken by Unitywater at the applicant’s cost.
A 150mm diameter water main is located within the road boundary fronting the
development site in Rene Street. Construction works, heavy traffic crossing the main,
excessive vibration and excavation close to the main may cause damage to the pipe.
Extreme care is required when working close to this infrastructure. All costs
associated with repair, replacement or alteration of infrastructure must be met by the
applicant.
Aboriginal Cultural Heritage Act 2003
There may be a requirement to establish a Cultural Heritage Management Plan
and/or obtain approvals pursuant to the Aboriginal Cultural Heritage Act 2003 (ACH
Act).
The ACH Act establishes a cultural heritage duty of care which provides that: “A
person who carries out an activity must take all reasonable and practicable measures
to ensure the activity does not harm Aboriginal cultural heritage”. It is an offence to
fail to comply with the duty of care. Substantial monetary penalties may apply to
individuals or corporations breaching this duty of care. Injunctions may also be issued
by the Land and Resources Tribunal, and the Minister administering the ACH Act can
Page 18 of 24
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.