Skip to the record
Noosa’s premier civic archive.

Original source · versioned page text

Combined Approved Plans RAL21/0003

of 115

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (12.4 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
            Limitations of Report & Notes

            This report is based on information gathered from the field investigation and information provided by the
            client if any. Ground Drill should be notified immediately if ground conditions are found to differ from this
            report.

            Unless otherwise stated this report does not address the following issues;

                 •    Mining Subsidence.
                 •    Slope Stability (If the site is in a known slip area or is steep, it is recommended that a Geotechnical
                      Engineer be engaged to conduct a Slope Stability assessment).
                 •    Deep soft or settling soils
                 •    Soil Contamination, hazardous materials and or acid sulphate.
                 •    Any slopes, dimensions, levels, site features or plans in this report are approximate only show
                      approximate testing locations.
                 •    Flood levels (It is the client’s responsibility to inform us of any flood levels on the allotment).
                 •    If water is found in the boreholes this depth may vary greatly over time. This report does not address
                      the influence any natural springs may have on the structure.
                 •    It is the client’s responsibility to inform us of any nearby underground services that have been or will
                      be installed near the proposed area.
                 •    Earthworks could affect the design.
                 •    If any fill is placed on the allotment post investigation this could change the design.
                 •    Surface water is to be diverted away from the area.
                 •    This investigation undertaken consisted of the occluded boreholes/test pits, given the size of the site
                      it is possible that a problem could have been missed. eg. Filled dam/gully, soft soils, fill, springs,
                      boulders, rock etc. We cannot give a definitive assurance that none of these problems exist on the site
                      unless we did a greater number of boreholes which would be uneconomical and impractical.


                                                  Maintenance and Operation of System
                  •    Scrape all dishes to remove fats, grease, etc. before washing
                  •    Don't use a garbage grinder
                  •    Use biodegradable soaps
                  •    Use a low-phosphorus detergent
                  •    Don't use powerful bleaches
                  •    Don't put sanitary napkins and other hygiene products into the system
                  •    Spray or irrigation areas should have access restricted
                  •    Divert surface water away from land application area
                  •    No vehicles or stock should be allowed on trenches, beds or irrigation area.
                  •    Deep rooting trees or shrubs should not be grown over absorption trenches or pipes
                  •    Vegetable gardens and/or fruit trees should not be planted within or near area, where there is a
                       possibility of airborne spray coming into contact with the plant.
                  •    Structures should not be constructed near areas that encourage people to congregate.
                  •    Play areas and equipment should be well away from areas where there is no possibility of spray
                       coming into contact with humans.
                  •    Treatment plants and septic tanks are to be desludged every 3-5 years.
                  •    Ground Drill will not be liable for any Council Inspection, submission or reviewing fees due to
                       changes in report or plan requested by client or Council.
                  •    If any part of this design is unclear, please call before buying products or installing.
                  •    This report must be approved by the local authority and appropriate permits issued before any works
                       can be undertaken.
                  •    Installer is to contact Noosa Shire Council prior to burying the system for a site inspection and
                       certification.
                  •    Follow the manufacturer's instructions, relevant codes, standards and guidelines for installation,
                       servicing, maintaining and cleaning the system and irrigation area/trenches/beds




Document Set ID: 21426326
Version: 1, Version Date: 24/03/2021
Log in to download the original file

Combined Approved Plans RAL21_0003.pdf · 12.4 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.