MCU16/0012 Attach B Engineering report & SMP
Original PDF page 9, section 1. The text section number identifies this passage in the reader.
ENG
Engineering Report & Stormwater Management Plan
Date: 24/06/2016 Document No.: 15087-ENG-01.Docx
By: MRS Revision No.: C
SPP2016 PART E: INTERIM DEVELOPMENT ASSESSMENT
YES / NO
REQUIREMENTS. STATE INTEREST – WATER QUALITY
Material change of use for urban purposes that involves a land area
greater than 2500m2 that:
will result in an impervious area greater than 25% of the net
developable area YES
Will result in 6 or more dwellings NO
Reconfiguring a lot for urban purposes that involves a land area
greater than 2500m2 and will result in six or more lots: NO
Operational works for urban purposes that involve disturbing more
than 2500m2 of land
YES
Table 5.1: Water Quality Objectives
As the proposed development triggers one or more applicable items in the above Table 5.1,
the State Planning Policy April 2016 is applicable and compliance will be expected by the local
government authority.
To achieve the above State Planning Policy outcomes the development is to:
avoid or minimise development impacts arising from altered stormwater quality and
flow by providing for development and construction activities in accordance with
acceptable design objectives
avoid or minimise development impacts of waste water (other than contaminated
stormwater) on water quality objectives
avoid or minimise development impacts arising from the creation or expansion of
non-tidal artificial waterways such as urban lakes
The proposed development will comply with the State Planning Policy April 2016 – Water
Quality policies.
A copy of the completed State Planning Policy April 2016 —Water Quality development
assessment code is attached in Appendix E.
b. Water Quality Objectives
Water quality parameters and the proposed limits applicable to this site have been selected in
accordance with SPP2016 Appendix 3, Table B and MUSIC Modelling Guidelines for South East
Queensland Version (2010).
It is proposed that best practice stormwater treatment be used and therefore it is required to
demonstrate the achievement of the following load reduction targets:
A PO Box 26, Carina Q 4152 8|P a g e
E [email protected]
W www.vtce.com.au
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.