Decision Notice - Approved by Delegation of Authority OPW24 0103 (As Published) · OPW24/0103
e. Phyllanthus multiflorus and Dietes grandiflora within
the Douglas Street Frontage with Hovea acutifolia,
phebalium woombye and Banksia oblongifolia.
CURRENCY PERIOD
2. The Currency Period for this development approval lapses if the development has not
substantially started by 8 October 2026, unless an application to extend the currency period
is approved by Council.
SITE SPECIFIC CONDITIONS
Bonds
3. A site control and/or compliance bond of $10,000 is to be submitted to Council prior to the
pre-start meeting. The pre-start meeting will only be held once Council's Construction
Engineering Officer has confirmation that the bond monies have been received by Council.
The bond will be refunded less any costs incurred by Council in ensuring compliance with
these conditions or any additional inspections incurred for substandard work or work
undertaken not in accordance with this permit.
4. Bonds must:
a. have approval of the bond calculations and amount from Council prior to lodgement;
b. be lodged with Council and accompanied by the Bond Administration Fee/s; and
c. be requested for release by writing to Council, when relevant approval requirements
have been met
PRIOR TO COMMENCEMENT OF WORKS
Engineering
5. All necessary approvals from external service providers (e.g., Unitywater) and external
parties on which the development works are proposed have been obtained and a copy
supplied to Council.
6. A condition report including photographs of the frontage of the site must be completed and
submitted to council at the prestart meeting / prior to any works commencing.
(*) Refer to Advisory Note
7. Certificates demonstrating currency of public liability insurance and works insurance covering
the works must be submitted to Council prior to the prestart meeting.
8. Council must be contacted at least 5 working days prior to any works commencing to
organise a prestart. The contact number to arrange a pre-start meeting is 5329 6500. The
pre-start meeting must include the relevant parties for the following aspects of the works:
a. Civil engineering works;
b. Landscape works;
c. Erosion and sediment control works; and
d. Other relevant parties
9. A Construction Management Plan must be submitted to Council for agreement prior to the
pre-start meeting and must specifically address the following:
a. Traffic management during all aspects of the construct phase including:
i. A Traffic Management Control Plan in accordance with Manual of Uniform Traffic
Control Devices (MUTCD) detailing all temporary signage and traffic control
measures prior to construction;
Page 3 of 11
Document Set ID: 23291220
Version: 3, Version Date: 09/10/2024
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Decision Notice - Approved by Delegation of Authority OPW24 0103 (As Published).pdfRelated documentApplication case desk ↗
About this file
- File size
- 175 KB (small file)
- File type
No other editions are linked here.