Decision Notice - Approved by Delegation of Authority OPW24 0103 (As Published) · OPW24/0103
ii. Maintenance of safe vehicle and pedestrian access across the Douglas Lane and
Duke Street frontages of the site both during daily construction and after daily
construction has ceased;
iii. Proposed fencing to the site during the construction phase of the development;
iv. Adequate parking arrangements for construction workers and deliveries (i.e.,
materials, concrete pump, concrete truck, etc.); and
v. No queuing of trucks is permitted on residential streets, especially prior to
7.00am. Further parked trucks must have engines turned off.
b. Maintenance and protection of water quality and existing drainage lines through the
construction site through the implementation of appropriate erosion and sediment
control measures;
c. Works programme identifying key components of the works and their respective
durations;
d. Establishment of a communication protocol with the general public, adjoining owners,
emergency services and local businesses to advise of agreed construction times,
impacts on traffic and services and other relevant issues;
e. Include a post out to the local residents and businesses advising of the proposed
development, the expected time frames and the site contact details;
f. Include signage in prominent locations on the boundaries of the site advising of the
proposed development, the expected time frames and the site contact details;
g. identification of complaint management procedures including:
i. contact details for the on-site manager;
ii. dispute resolution procedures; and
h. For haulage operations involving significant volumes of fill material or excavated
material being transported onto or off the site: details on the location of external fill
sites/sources, the haulage route, type of vehicle to be utilised during filling operations
and frequency of usage. NB any damage to the existing road system as a result of
haulage operations shall be fully repaired at the applicant’s expense.
10. Prior to requesting a prestart meeting:
a. Receipt of amended plans approval.
11. Any changes to the details associated with the supervising RPEQ or Principal Contractor
during construction, must be notified to council in writing within five business days of the
change occurring.
12. Any conflict between the development and an existing or proposed service must be referred
to the relevant service authority for determination prior to commencement of works.
DURING CONSTRUCTION
Landscaping Works
13. Landscape works must be supervised, undertaken and certified by qualified persons*. All
works must be completed in accordance with this Decision Notice and must include in
particular:
a. the works generally shown on the Approved Plans except where varied by the
conditions of this approval. The landscape plans must be resubmitted prior to a prestart
meeting.
b. Existing trees within the Duke Street Road reserve must be retained, unless written
authorisation from Council is granted for the clearing.
c. The relevant conditions of the higher order Material Change of Use approval viz.
MCU23/0070 to which this approval relates.
Page 4 of 11
Document Set ID: 23291220
Version: 3, Version Date: 09/10/2024
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Decision Notice - Approved by Delegation of Authority OPW24 0103 (As Published).pdfRelated documentApplication case desk ↗
About this file
- File size
- 175 KB (small file)
- File type
No other editions are linked here.