Council archive · source document
Delegated Report - Code - Planning RAL26 0015 (As Published) · RAL26/0015
Damage to Services and Assets
26. Any damage caused to existing services and assets as a result of the development works
must be repaired at no cost to the asset owner at the following times:
a. where the damage would cause a hazard to pedestrian or vehicle safety, immediately;
or
b. where otherwise, upon completion of the works associated with the development.
Any repair work which proposes to alter the alignment or level of existing services and assets
must first be referred to the relevant service authority for approval.
5. REFERENCE DOCUMENTS
Plan No. Rev. Plan/Document Name Date
LAK08 A Basic Ecological Site Assessment prepared by May 2026
Urban Forest Concepts
LAK08 A Rehabilitation Management Plan prepared by May 2026
Urban Forest Concepts
J001445 2 Bushfire Hazard Assessment and Management 8 May 2026
Plan prepared by North Coast Environmental
Services
6. REFERRAL AGENCIES
Not applicable.
7. ADVISORY NOTES
The following notes are included for guidance and information purposes only and do not form part
of the assessment manager conditions:
Infrastructure Charges
1. All developments and/or changes to existing developments may require payment of
“Infrastructure Charges” (as applicable) in accordance with Council’s “Charges Resolution”
made pursuant to the planning legislation and regulations current at the time of issue. For
further information, please refer to https://www.noosa.qld.gov.au/planning-
development/development-tools-guidelines/infrastructure-charges
Qualified Person
2. For the purpose of preparing a Rehabilitation Plan, and for preparing reporting of compliance
with Land rehabilitation requirements of this Decision Notice, a qualified person is considered
to be a landscape architect or ecologist with a minimum of 3 years current experience in the
field of landscape design and land rehabilitation.
3. For the purpose of preparing a Bushfire Management Plan, and for certifying compliance
with the bushfire requirements of this Decision Notice, a qualified person is considered to be
an ecologist with a minimum of 3 years current experience in the field of bushfire assessment
and management.
Building and Construction Industry (Portable Long Service Leave) Levy
4. The QLeave levy must be paid prior to the issue of a development permit where it is required.
Council will not be able to issue a Decision Notice without receipt of details that the Levy has
been paid.
Page 14 of 15
Document Set ID: 24837619
Version: 14, Version Date: 07/09/2026
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Delegated Report - Code - Planning RAL26 0015 (As Published).pdfRelated documentApplication case desk ↗
About this file
- File size
- 1.1 MB (small file)
- File type
No other editions are linked here.