Council archive · source document
Decision Notice - 010.2008.00000831.001 [As Published] · 142008.831
Officer: Tracy Jones
Direct Telephone: (07) 5449 5228
Response Address: PO Box 141, Tewantin QLD 4565
Email: [email protected]
Our Reference: 2008/831
Your Reference:
25 August 2008
Building Surveying Professionals Qld Pty Ltd
PO Box 1632
BUDERIM QLD 4556
Dear Sir
Decision Notice
Integrated Planning Act 1997
I refer to your application and advise that on 25 August 2008 Council decided to approve the
application in full subject to conditions.
Details of the decision are as follows:
1 APPLICATION DETAILS
Application No: 2008/831
Street address: 247, 249 & 253 David Low Way, Peregian Beach
Real property description: Lots 1 & 2 RP 903222 & Lot 26 P 9315
Planning Scheme: The Noosa Plan
2 DECISION DETAILS
The following type of approval has been issued:
Development Permit for Operational Works - Landscaping, Frontage Works, Roadworks,
Stormwater, Drainage, Water Supply and Sewerage, Sediment and Erosion Controls and
Earthworks
3 RELEVANT PERIOD OF APPROVAL
The relevant period for this Development Approval is identified in the Assessment Manager
conditions.
4 ASSESSMENT MANAGER CONDITIONS
Landscaping
1. The site is to be landscaped in accordance with Council’s Landscaping Code and Planning
Scheme Policy PSP3 on Landscaping Plants and Guidelines and approved plans as listed
below: -
Plan / Rev. Plan / Document Name Date
Document No.
Page 1 of 11
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalFull text of the other 10 pages
Page 2
2008/831
LA 01 - 01 of 04 C Operational Works Hardscape Plan – 17-06-08
Landgraphics
LA 02 - 02 of 04 C Operational Works Landscape Plan – 17-06-08
Landgraphics
LA 03 - 03 of 04 C Operational Works Landscape Details – 17-06-08
Landgraphics
LA 04 - 04 of 04 C Operational Works Landscape Details – 17-06-08
Landgraphics
and may be amended by these conditions.
2. The landscape construction is to be implemented in accordance with the amended landscape
plan, planting schedule and horticultural industry best practices.
3. All trees must be located a minimum of 1 metre from all services to prevent root/service
conflict and to provide future ease of maintenance requirements
4. All native plant species located in-group plantings shall not be subjected to any hedging
maintenance regimes.
5. All street trees and internal trees 45 litre and greater must be securely staked and tied to
assist their growth during the establishment period.
6. The density of planting must achieve the set out requirements as detailed on the approved
landscape plan.
7. All landscaping treatment shall not unduly restrict or prevent access to service meters within
the site.
8. All manholes, inspection pits and grates are to be raised to finish surface level and kept free of
cover and be visible at all times to ensure prompt access in case of emergency.
9. The Body Corporate of this development is responsible for the ongoing maintenance of any
landscaping within the road reserve.
10. This Development Permit lapses if the development has not happened by 25 August 2010,
unless application to extend the currency is approved by Council.
Land Development
11. The development shall be carried out in accordance with the approved plans listed below or as
modified herein
Plan / Rev. Plan / Document Name Date
Document No.
070172 H – 03 B Hydraulic Services – Plumbing Design 11.06.08
TD & Drafting
M3087/C01 A Cover Sheet – Barlow Gregg
M3087 – C02 B Sediment & Erosion Control Plan – 27/5/08
Barlow Gregg
M3087 – C03 F Carpark Layout Plan – Barlow Gregg 19/8/08
M3087 – C04 C Standard Details – General – Barlow 27/5/08
Gregg
M3087 – C05 F Stormwater Layout Plan 19/8/08
Page 2 of 11
Page 3
2008/831
M3087 – C06 D Stormwater Longitudinal Sections & 19/8/08
Details – Barlow Gregg
BM003087 – 00 F Basement Slab Relief Drainage System 19/8/08
– 03 Layout – Barlow Gregg
BM003087 – B C Basement Footing Details Sheet 2 – 15/7/08
– 04 Barlow Gregg
W-02-02 O Ground Floor Plan – CORE 28.07.07
Architecture
W-01-01 H Site Plan – CORE Architecture 28.07.07
12. A Traffic Management Plan (TMP) for the development addressing all construction phases
shall be prepared by suitably qualified persons and submitted to Council for approval prior to
the pre start meeting. The TMP shall address, but not be limited to, all items listed below:
12.1 A single nominated access location to and from the site.
12.2 The plan should detail the routing of trucks to and from the site.
12.3 Provision of onsite parking for personnel working on this development, as
there is limited parking available in adjacent streets.
12.4 Provision of safe cycle and pedestrian movements in the vicinity of the
development along David Low Way.
12.5 No queuing of trucks is permitted on residential streets, especially prior to
7.00am. Further parked trucks must have engines turned off.
12.6 Provision of signage and traffic controllers in accordance with Manual of
Uniform Traffic Control Devices and the Transport Infrastructure (Roads) Act.
12.7 Provide an indication where the surplus spoil is to be transported to.
13. The finished level of all mulch in garden beds and landscaped medians is to be a minimum of
50mm below the level of the adjacent top of kerb. All landscaping is to be constructed in
accordance with Council’s Planning Scheme Policy PSP03 Landscaping Plants and
Guidelines.
14. Suitable root barriers shall be installed where proposed trees are adjacent to paths, pavement,
etc, in accordance with Council’s Planning Scheme Policy PSP03 Landscaping Plants and
Guidelines.
15. The pipe class for stormwater drainage line 3/2 to EX/2 shall be “Class 2”. (Drawing M3087-
C05-F refers).
16. Council’s Construction Technical Officer (phone 0410 512 505) shall be given seven (7) days’
notice of intention to commence works to arrange a “pre start” meeting prior to the
commencement of those works.
17. The principal contractor must have all the appropriate insurance and public liability
documentation to carry out the works. The principal contractor is also responsible to ensure
that any sub contractors also have the appropriate insurance and public liability
documentation.
18. Prior to the “pre start” meeting, the principal contractor must be provided with a copy
of Council’s signed approved drawings and conditions by the applicant.
Page 3 of 11
Page 4
2008/831
19. The Consulting Engineers for the project shall be currently Registered Professional Engineers
of Queensland (RPEQ). The consulting engineers are responsible for arranging all
inspections with Council’s Construction Technical Officer or nominated staff. Council’s
Construction Technical Officer shall provide an inspection form for signing off by the Engineer
at appropriate stages of construction, during on-site meetings. Council’s Construction
Technical Officer will also sign the form at each stage when requested conditions have been
satisfied. The works will be accepted “On maintenance” after this form has been signed by
Council’s Construction Technical Officer, together with a letter from the Engineer requesting
that the works go “On maintenance”.
20. Prior to works commencing, Council is to be advised of the Engineer (RPEQ) supervising the
project. (This person will be the contact for the project).
21. Council standards shall apply to these works unless otherwise modified herein.
22. The person acting on this permit shall ensure that its consultants and contractors take all
reasonable care during the construction of the engineering works to ensure that Council
property, road pavements or facilities (such as underground drainage, water supply,
sewerage, footpaths, kerbing, landscaping, street furniture, etc.) are protected against any
damage or interference whatsoever.
If any Council property or facilities should be damaged by the Applicant or any of its
Consultants or Contractors through any cause whatsoever in the course of, directly or
indirectly, carrying out the engineering works, the Applicant and/or its Contractors shall
forthwith notify the Manager Land Development and shall forthwith rectify the damage to that
property or facility at its cost and to the satisfaction of the Manager Land Development.
All rectification works are to be completed prior to the commencement of the use or,
alternatively, the Applicant may request Council to carry out the rectification work at the
Applicant’s cost, such cost being paid by the Applicant to Council prior to the commencement
of the use.
In the case of any emergency, Council shall be entitled to rectify such damage at the cost of
the Applicant, such cost being paid prior to the commencement of the use.
23. The development of the site shall be carried out in such a manner as to prevent dust and/or
sand nuisance to residents and/or tenants in the vicinity of the development.
24. Construction work and other associated activities are permitted only during the hours
of 7.00 am and 6.00 pm Monday to Saturday. No work is permitted on Sundays or public
holidays, except where extended hours are approved by the Manager, Land Development, or
his nominee.
25. Safe pedestrian access along David Low Way in the vicinity of the development shall be
maintained at all times. If footpath / road closures are necessary to carry out construction
works, Council’s Construction Technical Officer (phone 0410 512 505) must be notified prior to
the proposed closure.
26. Sediment and erosion control measures must be in place prior to works commencing. If such
measures are not in place or are not satisfactory, “on the spot” fines may be issued. Such
fines can be issued if sediments from the site are found to enter or have the potential to enter
Council’s stormwater system or natural waterways. Although the sediment and erosion control
measures have been approved on Barlow Gregg’s drawing M3087 – C02 B, Council’s
Manager, Land Development, may request further controls to be installed should approved
measures be inefficient.
27. The owner of the subject property shall inspect the gross pollutant traps on a weekly basis,
after each storm event and in accordance with the manufacturer’s specifications. The owner
shall also enter into an ongoing maintenance contract with a Registered Contractor to clean
and maintain the gross pollutant traps at regular three monthly intervals and on an “On Call”
basis in the case of an emergency.
Page 4 of 11
Page 5
2008/831
The management and maintenance of the gross pollutant traps shall be included in the
Community Management Scheme for the completed development.
28. All stormwater drainage lines, including private drainage lines or as otherwise approved by
Council’s Manager of Land Development shall be inspected by closed circuit television
(CCTV) at the completion of all works and immediately prior to acceptance of ‘On
Maintenance’. Council’s Construction Technical Officer shall be advised of the timing of this
inspection.
A report of the CCTV inspection, including photographic records (which includes photos &
video recordings burnt onto a CD) of the inspection shall be submitted to the Council for
approval. Any defects or substandard works shall be recorded and accurately illustrated on
the drainage plan showing the location of the defect(s).
Substandard work will not be accepted ‘On Maintenance’ and must be rectified at the
applicants expense with a further CCTV inspection arranged once the rectification works have
been completed.
To this extent all CCTV inspections, including any additional inspections necessary following
defect identification and rectification, shall be entirely at the applicant’s expense. Any costs
incurred by Council in reviewing the CCTV inspection results shall also be borne by the
applicant.
29. Prior to acceptance of civil works to become Council assets "On Maintenance", the lodgement
of satisfactory “As Constructed” records shall be submitted to Council.
As Constructed drawings and data shall be certified by a qualified experienced Civil Engineer
(RPEQ) for design intent, and a Licensed Surveyor shall certify the cadastre and the location,
level and type of all services and structures. All of which shall be submitted to Council for
checking and for Council’s records.
The data must fully detail levels for all engineering works including but not limited to drainage
structures, finished ground levels and pavement surface levels. The data shall be submitted in
the Asset Design and As Constructed (ADAC) digital format. Guidelines on the use of ADAC
are available at www.adac.com.au and Council’s “Noosa Planning Scheme Policy 5 –
Engineering Design Standards – Roads, Drainage and Earthworks”.
Approval of works shall not be granted until all As Constructed information has been supplied
and accepted by Council.
30. A 5% cost of works to become Council assets or $1,500 bond (whichever is the greater) will
be imposed on construction works during the maintenance period, which is a minimum period
of 12 months duration. Such bond must be lodged by, and shall only be accepted from the
Developer for the works.
31. The works to become Council assets will not be accepted "On Maintenance" until the
landscaping is completed.
32. Notwithstanding that Council has checked the plans with due care, where it is found during
construction that variations from Council's standards exist, then Council standards shall apply.
Water and Sewer
33. The names of any proposed contractors for works are to be submitted in writing, together with
copies of current Public Liability and Workers Compensation Insurances together with
certificates of currency for those policies, for consideration by the Assessment Manager seven
(7) days prior to pre-start meetings and commencement of works.
A separate letter will then be issued approving the contractor (or otherwise) for the works. No
other contractor or subcontractor shall be engaged to carry out the works or any part of the
works without the written approval of the Assessment Manager.
Page 5 of 11
Page 6
2008/831
34. Council’s Water & Sewerage Inspector shall be given (7) days notice of intention to commence
works. A pre-start meeting shall be arranged prior to commencement of works by contacting
Council’s Water & Sewerage Inspector, Mr Trevor Mourilyan, Ph. 0417 780 830. Inspector is
only available for pre-start meetings, inspections and testing etc. between the hours of 6:30am
to 4:00pm, Monday to Friday. Inspector will not be available outside these hours unless prior
approval is obtained from the Water & Sewerage Capital Works Manager with any costs
incurred by Council outside the hours nominated above, met by the Contractor/Developer.
These costs will be in addition to normal inspection fees.
35. All works to raise the existing sewer manhole lid (MP20/03/07) is to be carried out by a
Contractor that has written approval by Council.
36. Notwithstanding that Council has checked the plans with due care, where it is found during
construction that variations exist with Council's standards, Council standards shall apply.
37. It is the responsibility of the applicant to ensure that its consultants and contractors take all
reasonable care during the construction of the engineering works to ensure that Council
property or facilities (such as underground drainage, water supply and sewerage) are
protected against any damage or interference whatsoever. If any Council property or facilities
should be damaged by the applicant or any of its consultants or contractors through any cause
whatsoever in the course of, directly or indirectly, carrying out the engineering works, the
applicant and/or its contractors shall forthwith notify the Assessment Manager and shall
forthwith rectify the damage to that property or facility at its cost to the satisfaction of the
Assessment Manager prior to the sealing of the survey plan and/or acceptance of the works
on-maintenance. Alternatively, the applicant may request the Council to carry out the
rectification work at the applicant's cost, such cost being paid by the applicant to the Council
prior to the sealing of the survey plan and/or acceptance of the works 'on maintenance'
provided that in the case of emergency, the Council shall be entitled to rectify such damage at
the cost of the applicant such cost being paid prior to the sealing of the survey plan and/or
acceptance of the work 'on maintenance'.
38. The Contractor shall make all necessary arrangements for supply of water required for
construction works. The use of hydrant standpipes on Council mains will NOT be permitted.
Contractors should contact Council’s Water Section on phone 5449 5254 to obtain an
application form for issue of a key to access Council’s water tanker filling stations. Conditions
of access and location of filling stations are detailed on the application form.
39. As Constructed drawings in both hardcopy and digital format (ADAC) produced in GDA94
Zone 56 coordinate value to the standards and requirements of the Assessment Manager are
required for Council records. Such 'as constructed' drawings will be required prior to works
being accepted "on maintenance", where applicable. Requirements for "as constructed"
information are detailed in the current version of Council's Engineering Design Standards
(Water & Sewerage) Manual.
Release of plans of survey and/or acceptance of the works on-maintenance will not be
considered until lodgement of satisfactory 'as constructed' records.
Please note that bonding of outstanding works will not be considered by Council.
40. Construction work and other associated activities are permitted only during the hours of
7:00am and 6:00pm Monday to Saturday. No work is permitted on Sundays or public
holidays, except where extended hours are approved by the Assessment Manager or his
nominee.
41. Cut-ins to existing live sewer are to be performed by Approved Contractor. Noosa Council Works
Inspector shall be present during any work on live sewer undertaken by contractor. <An
additional fee of $160.00 (included below) is required to cover costs associated with these live
sewer works.
Page 6 of 11
Page 7
2008/831
42. Fees applicable to the above project are listed below and are to be paid within fourteen (14) days
of the date of this Decision Notice.
Plan Examination $ 930 – Paid
43. Builder to liaise with Council in respect to costs and programming of work to be carried out by
Council. Contact Councils Sewerage Administration on 5449 5254, to arrange a quote for works.
5 REFERRAL AGENCY CONDITIONS
The referral agencies applicable to this application are:
Referral Trigger Referral Status Referral Agency Referral Address
Nil
6 APPROVED PLANS/DOCUMENTS
The approved plans and / or documents for this development approval are listed in the following
table:
Plan / Document No. Rev. Plan / Document Name Date
LA 01 - 01 of 04 C Operational Works Hardscape Plan – 17-06-08
Landgraphics
LA 02 - 02 of 04 C Operational Works Landscape Plan – 17-06-08
Landgraphics
LA 03 - 03 of 04 C Operational Works Landscape Details – 17-06-08
Landgraphics
LA 04 - 04 of 04 C Operational Works Landscape Details – 17-06-08
Landgraphics
070172 H – 03 TD B Hydraulic Services – Plumbing Design 11.06.08
& Drafting
M3087/C01 A Cover Sheet – Barlow Gregg
M3087 – C02 B Sediment & Erosion Control Plan – 27/5/08
Barlow Gregg
M3087 – C03 F Carpark Layout Plan – Barlow Gregg 19/8/08
M3087 – C04 C Standard Details – General – Barlow 27/5/08
Gregg
M3087 – C05 F Stormwater Layout Plan 19/8/08
M3087 – C06 D Stormwater Longitudinal Sections & 19/8/08
Details – Barlow Gregg
BM003087 – 00 – 03 F Basement Slab Relief Drainage System 19/8/08
Layout – Barlow Gregg
BM003087 – B – 04 C Basement Footing Details Sheet 2 – 15/7/08
Barlow Gregg
W-02-02 O Ground Floor Plan – CORE 28.07.07
Architecture
W-01-01 H Site Plan – CORE Architecture 28.07.07
Page 7 of 11
Page 8
2008/831
7 ADVISORY NOTES
The following Advisory Notes are for information purposes only and do not form conditions of
approval:
1. Should any changes or modifications to the approved plans be required as a result of
construction constraints, a “Request to change an existing approval” (Form 2 Development
Application) under the Integrated Planning Act 1997 must be made. Amended plans clearly
indicating the changes must be lodged with this application along with the appropriate fees.
2. All hydraulic drawings shall be submitted to Councils Plumbing Department for assessment for
a Plumbing Compliance Permit.
Aboriginal Cultural Heritage Act 2003
There may be a requirement to establish a Cultural Heritage Management Plan and/or obtain
approvals pursuant to the Aboriginal Cultural Heritage Act 2003.
The ACH Act establishes a cultural heritage duty of care which provides that: “A person who carries
out an activity must take all reasonable and practicable measures to ensure the activity does not
harm Aboriginal cultural heritage”. It is an offence to fail to comply with the duty of care. Substantial
monetary penalties may apply to individuals or corporations breaching this duty of care. Injunctions
may also be issued by the Land and Resources Tribunal, and the Minister administering the Act can
also issue stop orders for an activity that is harming or is likely to harm Aboriginal cultural heritage or
the cultural heritage value of Aboriginal cultural heritage.
You should contact the Cultural Heritage Co-ordination Unit on 07 3238 3838 to discuss any
obligations under the ACH Act.
8 PROPERTY NOTES
Not applicable
9 PRELIMINARY APPROVAL OVERRIDING SCHEME
Not applicable
10 FURTHER DEVELOPMENT PERMITS REQUIRED
Type of Development Permit required Subject of the required Development Permit
Nil
11 SELF ASSESSABLE CODES
Not applicable
12 SUBMISSIONS
Not applicable
13 REASONS / GROUNDS FOR APPROVAL DESPITE CONFLICT WITH SCHEME
Not applicable
14 RIGHTS OF APPEAL
You are entitled to appeal against this decision. A copy of the relevant appeal provisions from the
Integrated Planning Act 1997 is attached.
Page 8 of 11
Page 9
2008/831
During the appeal period, you as the applicant may make written representations to Council about
the conditions contained within the development approval. If Council agrees or part agrees with the
representations, a “negotiated decision notice” will be issued. Only one “negotiated decision notice”
may be given. Taking this step will defer your appeal period, which will continue after Council makes
its decision. (Refer to sections 3.5.17 and 3.5.18 of the Integrated Planning Act 1997).
15 OTHER DETAILS
Should you wish to obtain more information about Council’s decision electronic copies are available
on line at www.sunshinecoast.qld.gov.au, or at Council Offices.
Yours faithfully,
Tracy Jones
SENIOR PLANNING OFFICER
Page 9 of 11
Page 10
2008/831
Appeal Rights
INTEGRATED PLANNING ACT 1997 & 1998 REGULATION
(5) If an application is processed under section
The following is an extract from the Integrated 6.1.28(2), appeal rights for submitters for the
Planning Act (Chapter 4). application are available only for the aspects of the
Division 8 - Appeals to court relating to development that would have required public
development applications notification under the repealed Act.
Appeals by applicants
(6) If an application involves assessment
4.1.27.(1) An applicant for a development against a concurrence agency code, appeal rights
application may appeal to the court against any of for submitters for the application are not available
the following- against the part of the approval that represents the
(a) the refusal, or the refusal in part, of a concurrence agency’s response for the code.
development application; Appeals by advice agency submitters
(b) a matter stated in a development approval, 4.1.29.(1) An advice agency may, within the limits
including any condition applying to the of its jurisdiction, appeal to the court about the
development, and the identification of a code giving of a development approval for a
1
under section 3.1.6; development application if-
(c) the decision to give a preliminary approval (a) the development application involves impact
when a development permit was applied for; assessment; and
(d) the length of a currency period; (b) the advice agency told the applicant and the
(e) a deemed refusal. assessment manager to treat its response to
(2) An appeal under subsection (1)(a) to (d) the application as a submission for an appeal.
must be started within 20 business days (the (2) The appeal must be started within 20
“applicant’s appeal period”) after the day the business days after the day the decision notice or
decision notice or negotiated decision notice is negotiated decision notice is given to the advice
given to the applicant. agency as a submitter.
(3) An appeal under subsection (1)(e) may be Appeals for matters arising after approval given
started at any time after the last day a decision on (co-respondents)
the matter should have been made. 4.1.30.(1) For a development approval given for a
Appeals by submitters development application, a person to whom any of
4.1.28.(1) A submitter for a development the following notices have been given may appeal
application may appeal to the court about- to the court against the decision in the notice-
(a) the giving of a development approval, including (a) a notice giving a decision on a request for
any conditions (or lack of conditions) or other extension of the currency period for an
provisions of the approval; or approval;
(b) the length of a currency period for the approval. (b) a notice giving a decision on a request to make
a minor change to an approval.
(2) The appeal must be started within 20
business days (the “submitters appeal period”) (2) The appeal must be started within 20
after the day the decision notice or negotiated business days after the day the notice of the
decision notice is given to the submitter. decision is given to the person.
(3) If a person withdraws a submission before (3) Subsection (1)(a) does not apply if the
the application is decided, the person may not approval resulted from a development
appeal the decision. application (superseded planning scheme)
that was assessed as if it were an
(4) If an application involves both impact application under a superseded planning
assessment and code assessment, appeal rights scheme.
for submitters are available only for the part of the
application involving impact assessment. (4) Also, a person who has made a request
mentioned in subsection (1) may appeal to
the court against a deemed refusal of the
request.
1
Section 3.1.6 (Preliminary approval may override
local planning instrument)
Page 10 of 11
Page 11
2008/831
(5) An appeal under subsection (4) may be For Building Works Only
started at any time after the last day the Rights of appeal conferred by Section 4.2.9 of the
decision on the matter should have been Integrated Planning Act 1997 as follows:
made.
Division 3 – Appeals to tribunals relating to
development applications
Division 9 - Appeals to court about other
matters Appeals by applicants
Appeals for matters arising after approval given
(no co-respondents)
4.2.9(1) An applicant for a development application
4.1.31.(1) A person to whom any of the following may appeal to the Building and Development
notices have been given may appeal to the court Tribunal against any of the following-
against the decision in the notice-
(a) the refusal, or the refusal in part, of a
(a) a notice giving a decision on a request to development application;
change or cancel a condition of a development
approval. (b) a matter stated in a development approval,
2 including any condition applying to the
(b) a notice under section 6.1.44 giving a decision development, and the identification of a code
to change or cancel a condition of a under section 3.1.6;
3
development approval.
(c) the decision to give a preliminary approval when a
(2) The appeal must be started within 20 development permit was applied for;
business days after the day the notice of the
(d) the length of a period mentioned in section 3.5.21
decision is given to the person.
currency period;
(3) Also, a person who has made a request
(e) a deemed refusal.
mentioned in subsection (1)(a) may appeal
to the court against a deemed refusal of the (2) An appeal under subsection (1)(a) to (d) must
request. be started within 20 business days (the “applicant’s
appeal period”) after the day the decision notice or
(4) An appeal under subsection (3) may be negotiated decision notice is given to the applicant.
started at any time after the last day the
(3) An appeal under subsection (1)(e) may be
decision on the matter should have been started at any time after the last day a decision on the
made. matter should have been made.
Appeals against decisions to change approval The Registrar for the Building and Development
conditions under the repealed Act Tribunal may be contacted at the website
4.1.33A.(1) A person who is dissatisfied with a http://www.localgovernment.qld.gov.au/
decision made on an application to change the
conditions attached to an approval given under
section 2.19(3)or section 4.4 of the repealed Act
may appeal to the court against-
(a) the decision; or
(b) a deemed refusal of the application.
(2) An appeal under subsection (1)(a) must be
started within 20 business days after the day notice
of the decision is to be given to the person.
(3) An appeal under subsection (1)(b) may be
started at any time after the last day a decision on
the matter should have been made.
Appeals against local laws
4.1.33B.(1) An applicant who is dissatisfied with a
decision of a local government or the conditions
applied under a local law about the use of premises
or the erection of a building or other structure
permitted by the planning scheme may appeal to
the court against the decision or the conditions
applied.
(2) The appeal must be started within 20
business days after the day notice of the decision
is given to the applicant.
2
Section 6.1.44 (Conditions may be changed or
3
cancelled by assessment manager or concurrence Section 3.1.6 (Preliminary approval may override
agency in certain circumstances) local planning instrument)
Page 11 of 11
Used in these records
Decision Notice - 010.2008.00000831.001 [As Published]Related documentApplication case desk ↗
About this file
- File size
- 72 KB (small file)
- File type
No other editions are linked here.