Council archive · source document
Decision Notice - 010.2008.00000831.001 [As Published] · 142008.831
2008/831
LA 01 - 01 of 04 C Operational Works Hardscape Plan – 17-06-08
Landgraphics
LA 02 - 02 of 04 C Operational Works Landscape Plan – 17-06-08
Landgraphics
LA 03 - 03 of 04 C Operational Works Landscape Details – 17-06-08
Landgraphics
LA 04 - 04 of 04 C Operational Works Landscape Details – 17-06-08
Landgraphics
and may be amended by these conditions.
2. The landscape construction is to be implemented in accordance with the amended landscape
plan, planting schedule and horticultural industry best practices.
3. All trees must be located a minimum of 1 metre from all services to prevent root/service
conflict and to provide future ease of maintenance requirements
4. All native plant species located in-group plantings shall not be subjected to any hedging
maintenance regimes.
5. All street trees and internal trees 45 litre and greater must be securely staked and tied to
assist their growth during the establishment period.
6. The density of planting must achieve the set out requirements as detailed on the approved
landscape plan.
7. All landscaping treatment shall not unduly restrict or prevent access to service meters within
the site.
8. All manholes, inspection pits and grates are to be raised to finish surface level and kept free of
cover and be visible at all times to ensure prompt access in case of emergency.
9. The Body Corporate of this development is responsible for the ongoing maintenance of any
landscaping within the road reserve.
10. This Development Permit lapses if the development has not happened by 25 August 2010,
unless application to extend the currency is approved by Council.
Land Development
11. The development shall be carried out in accordance with the approved plans listed below or as
modified herein
Plan / Rev. Plan / Document Name Date
Document No.
070172 H – 03 B Hydraulic Services – Plumbing Design 11.06.08
TD & Drafting
M3087/C01 A Cover Sheet – Barlow Gregg
M3087 – C02 B Sediment & Erosion Control Plan – 27/5/08
Barlow Gregg
M3087 – C03 F Carpark Layout Plan – Barlow Gregg 19/8/08
M3087 – C04 C Standard Details – General – Barlow 27/5/08
Gregg
M3087 – C05 F Stormwater Layout Plan 19/8/08
Page 2 of 11
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Decision Notice - 010.2008.00000831.001 [As Published]Related documentApplication case desk ↗
About this file
- File size
- 72 KB (small file)
- File type
No other editions are linked here.