Skip to the record
For the highest quality transcripts.

Council archive · source document

Decision Notice - 010.2008.00000831.001 [As Published] · 142008.831

of 11

Text shows just the words. Original shows the document exactly as it was published.

                                                                                          2008/831



42.    Fees applicable to the above project are listed below and are to be paid within fourteen (14) days
       of the date of this Decision Notice.
       Plan Examination                   $ 930 – Paid

43.    Builder to liaise with Council in respect to costs and programming of work to be carried out by
       Council. Contact Councils Sewerage Administration on 5449 5254, to arrange a quote for works.

5      REFERRAL AGENCY CONDITIONS
The referral agencies applicable to this application are:

 Referral Trigger              Referral Status   Referral Agency         Referral Address

 Nil

6      APPROVED PLANS/DOCUMENTS

The approved plans and / or documents for this development approval are listed in the following
table:
 Plan / Document No.       Rev.     Plan / Document Name                       Date
 LA 01 - 01 of 04          C        Operational Works Hardscape Plan –         17-06-08
                                    Landgraphics
 LA 02 - 02 of 04          C        Operational Works Landscape Plan –         17-06-08
                                    Landgraphics
 LA 03 - 03 of 04          C        Operational Works Landscape Details –      17-06-08
                                    Landgraphics
 LA 04 - 04 of 04          C        Operational Works Landscape Details –      17-06-08
                                    Landgraphics
 070172 H – 03 TD          B        Hydraulic Services – Plumbing Design       11.06.08
                                    & Drafting
 M3087/C01                 A        Cover Sheet – Barlow Gregg
 M3087 – C02               B        Sediment & Erosion Control Plan –          27/5/08
                                    Barlow Gregg
 M3087 – C03               F        Carpark Layout Plan – Barlow Gregg         19/8/08
 M3087 – C04               C        Standard Details – General – Barlow        27/5/08
                                    Gregg
 M3087 – C05               F        Stormwater Layout Plan                     19/8/08
 M3087 – C06               D        Stormwater Longitudinal Sections &         19/8/08
                                    Details – Barlow Gregg
 BM003087 – 00 – 03        F        Basement Slab Relief Drainage System       19/8/08
                                    Layout – Barlow Gregg
 BM003087 – B – 04         C        Basement Footing Details Sheet 2       –   15/7/08
                                    Barlow Gregg
 W-02-02                   O        Ground     Floor     Plan    –    CORE     28.07.07
                                    Architecture
 W-01-01                   H        Site Plan – CORE Architecture              28.07.07

                                                                                      Page 7 of 11

Used in these records

About this file

File size
72 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Decision Notice - 010.2008.00000831.001 [As Published].pdf · 72 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.