Decision Notice - 010.2008.00000831.001 [As Published] · 142008.831
2008/831
34. Council’s Water & Sewerage Inspector shall be given (7) days notice of intention to commence
works. A pre-start meeting shall be arranged prior to commencement of works by contacting
Council’s Water & Sewerage Inspector, Mr Trevor Mourilyan, Ph. 0417 780 830. Inspector is
only available for pre-start meetings, inspections and testing etc. between the hours of 6:30am
to 4:00pm, Monday to Friday. Inspector will not be available outside these hours unless prior
approval is obtained from the Water & Sewerage Capital Works Manager with any costs
incurred by Council outside the hours nominated above, met by the Contractor/Developer.
These costs will be in addition to normal inspection fees.
35. All works to raise the existing sewer manhole lid (MP20/03/07) is to be carried out by a
Contractor that has written approval by Council.
36. Notwithstanding that Council has checked the plans with due care, where it is found during
construction that variations exist with Council's standards, Council standards shall apply.
37. It is the responsibility of the applicant to ensure that its consultants and contractors take all
reasonable care during the construction of the engineering works to ensure that Council
property or facilities (such as underground drainage, water supply and sewerage) are
protected against any damage or interference whatsoever. If any Council property or facilities
should be damaged by the applicant or any of its consultants or contractors through any cause
whatsoever in the course of, directly or indirectly, carrying out the engineering works, the
applicant and/or its contractors shall forthwith notify the Assessment Manager and shall
forthwith rectify the damage to that property or facility at its cost to the satisfaction of the
Assessment Manager prior to the sealing of the survey plan and/or acceptance of the works
on-maintenance. Alternatively, the applicant may request the Council to carry out the
rectification work at the applicant's cost, such cost being paid by the applicant to the Council
prior to the sealing of the survey plan and/or acceptance of the works 'on maintenance'
provided that in the case of emergency, the Council shall be entitled to rectify such damage at
the cost of the applicant such cost being paid prior to the sealing of the survey plan and/or
acceptance of the work 'on maintenance'.
38. The Contractor shall make all necessary arrangements for supply of water required for
construction works. The use of hydrant standpipes on Council mains will NOT be permitted.
Contractors should contact Council’s Water Section on phone 5449 5254 to obtain an
application form for issue of a key to access Council’s water tanker filling stations. Conditions
of access and location of filling stations are detailed on the application form.
39. As Constructed drawings in both hardcopy and digital format (ADAC) produced in GDA94
Zone 56 coordinate value to the standards and requirements of the Assessment Manager are
required for Council records. Such 'as constructed' drawings will be required prior to works
being accepted "on maintenance", where applicable. Requirements for "as constructed"
information are detailed in the current version of Council's Engineering Design Standards
(Water & Sewerage) Manual.
Release of plans of survey and/or acceptance of the works on-maintenance will not be
considered until lodgement of satisfactory 'as constructed' records.
Please note that bonding of outstanding works will not be considered by Council.
40. Construction work and other associated activities are permitted only during the hours of
7:00am and 6:00pm Monday to Saturday. No work is permitted on Sundays or public
holidays, except where extended hours are approved by the Assessment Manager or his
nominee.
41. Cut-ins to existing live sewer are to be performed by Approved Contractor. Noosa Council Works
Inspector shall be present during any work on live sewer undertaken by contractor. <An
additional fee of $160.00 (included below) is required to cover costs associated with these live
sewer works.
Page 6 of 11
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Decision Notice - 010.2008.00000831.001 [As Published]Related documentApplication case desk ↗
About this file
- File size
- 72 KB (small file)
- File type
No other editions are linked here.