Code Assessment - 12 Eenie Creek Rd (RESOLVED DRAFT)
Environmental values of waters and development scenario. AND
existing building footprint, and at the
water quality Protection (Water) AO6.2 All stormwater runoff is
frontage a new garden bed is introduced
Policy 2009 and are identified on treated to achieve maximum
while the existing frontage garden is
the State Planning Policy removal of nutrients, gross
removed, so the net change is minor. Any
Interactive Mapping System. pollutants and suspended solids as
regrading associated with the accessible
determined by cost to efficiency
parking space is localised and will
ratios. (e.g. bioretention basins must
maintain existing drainage patterns and
be sized to achieve at least 80%
the existing point of discharge. No change
reduction in total suspended solids,
to the stormwater management system is
60% reduction in total phosphorous,
proposed. Confirmation of finished
45% reduction in total nitrogen and
surface treatment is a matter for detailed
90% reduction in gross polluta
design and is capable of being
conditioned.
PO7 AO7.1
Complies with PO
Water quality treatment systems Water quality treatment systems
The site is presently developed and
use natural processes and materials, are designed to be integrated into
sealed, and stormwater discharges to the
whenever possible, and are the landscape consistent with the
existing lawful point of discharge. The
integrated into development to technical design guideline
proposal does not materially alter the
enhance biodiversity and landscape published by Healthy Land and
impervious area: the works are within the
benefits. Water Water by Design for the
existing building footprint, and at the
feature. (eg. For Bioretention
frontage a new garden bed is introduced
Basins: Bioretention Technical
while the existing frontage garden is
Design Guidelines (October 2014)
removed, so the net change is minor. Any
and for Wetland Systems the
regrading associated with the accessible
Wetland Technical Design
parking space is localised and will
Guideline (May 2017).
maintain existing drainage patterns and
the existing point of discharge. No change
to the stormwater management system is
proposed. Confirmation of finished
surface treatment is a matter for detailed
design and is capable of being
conditioned.
PO8 AO8.1, AO8.2, AO8.3
Complies with PO
Water quality treatment Detailed life cycle costing is
The site is presently developed and
infrastructure to be dedicated as provided for the entire treatment
sealed, and stormwater discharges to the
public assets are proven to be train system including replacement
existing lawful point of discharge. The
suitable for its use and of a cost costs of asset parts.
proposal does not materially alter the
effective and efficient standard. AO8.2 Treatment systems dedicated
impervious area: the works are within the
Performance Outcomes as public assets are designed to
existing building footprint, and at the
minimise maintenance, renewal and
frontage a new garden bed is introduced
adaption costs and the requirement
while the existing frontage garden is
for specialised equipment, material
removed, so the net change is minor. Any
or maintenance techniques.
regrading associated with the accessible
AO8.3 Vegetated stormwater
parking space is localised and will
management systems to be
maintain existing drainage patterns and
dedicated as Acceptable Outcomes
the existing point of discharge. No change
public assets are established and
to the stormwater management system is
maintained during the maintenance
proposed. Confirmation of finished
period to ensure optimal vegetated
surface treatment is a matter for detailed
growth and that the functional
design and is capable of being
elements of the system achieve the
conditioned.
design function at the en
PO9 AO9.1, AO9.2
Complies with PO
Treatment systems are designed to Free draining inlets and outlets are
The site is presently developed and
eliminate or minimise health, safety provided to ensure that waters do
sealed, and stormwater discharges to the
and aesthetic hazards, including not pond for more than 24 hours.
existing lawful point of discharge. The
risks associated with insect AO9.2 Developments are designed
proposal does not materially alter the
breeding, odour and public safety. to eliminate retaining walls in
impervious area: the works are within the
Hydrology and waterway stability excess of 0.8m for any water quality