Code Assessment - 12 Eenie Creek Rd (RESOLVED DRAFT)

of 64

Page text shows just the words. Original shows the document exactly as it was published.

                                                                               removed, so the net change is minor. Any
                                                                               regrading associated with the accessible
                                                                               parking space is localised and will
                                                                               maintain existing drainage patterns and
                                                                               the existing point of discharge. No change
                                                                               to the stormwater management system is
                                                                               proposed. Confirmation of finished
                                                                               surface treatment is a matter for detailed
                                                                               design and is capable of being
                                                                               conditioned.

PO4                                    AO4.1, AO4.2, AO4.3, AO4.4,
                                                                               Complies with PO
Stormwater infrastructure is           AO4.5
                                                                               The site is presently developed and
compatible with existing               The location, design and
                                                                               sealed, and stormwater discharges to the
infrastructure, allows for easy        construction of stormwater
                                                                               existing lawful point of discharge. The
access for the ongoing maintenance     drainage structures is in accordance
                                                                               proposal does not materially alter the
by Council, is cost effective across   with PSP6 Engineering Design
                                                                               impervious area: the works are within the
its design life.                       Standards ­ Roads, drainage and
                                                                               existing building footprint, and at the
                                       earthworks.
                                                                               frontage a new garden bed is introduced
                                       AO4.2 Where infrastructure is
                                                                               while the existing frontage garden is
                                       located on private land an easement
                                                                               removed, so the net change is minor. Any
                                       is dedicated over the infrastructure
                                                                               regrading associated with the accessible
                                       in accordance with PSP6
                                                                               parking space is localised and will
                                       Engineering Design Standards ­
                                                                               maintain existing drainage patterns and
                                       Roads, drainage and earthworks.
                                                                               the existing point of discharge. No change
                                       AO4.3 Any alterations or repairs to
                                                                               to the stormwater management system is
                                       infrastructure as a result of the
                                                                               proposed. Confirmation of finished
                                       development are made at no cost to
                                                                               surface treatment is a matter for detailed
                                       Council.
                                                                               design and is capable of being
                                       AO4.4 Development avoids
                                                                               conditioned.
                                       stormwater inflow and infiltration
                                       to the sewer infrastructure network.
                                       AO4.5 Stormwater infrastructure is
                                       de

PO5                                    AO5.1, AO5.2
                                                                               Complies with PO
Stormwater drainage infrastructure     Stormwater drainage infrastructure
                                                                               The site is presently developed and
is aligned to avoid crossing           avoids crossing waterways,
                                                                               sealed, and stormwater discharges to the
waterways, wetlands, drainage lines    wetlands drainage lines and
                                                                               existing lawful point of discharge. The
and ecological important areas, or     ecologically important areas or
                                                                               proposal does not materially alter the
where it is demonstrated this is       follows the edge of existing
                                                                               impervious area: the works are within the
unavoidable, disturbed areas are       disturbed areas.
                                                                               existing building footprint, and at the
reinstated and revegetated upon        AO5.2 Table 9.4.8.3 Criteria for
                                                                               frontage a new garden bed is introduced
completion of works. Performance       assessment (part)
                                                                               while the existing frontage garden is
Outcomes Acceptable Outcomes
                                                                               removed, so the net change is minor. Any
Stormwater drainage infrastructure
                                                                               regrading associated with the accessible
is co­located with other
                                                                               parking space is localised and will
infrastructure within a combined
                                                                               maintain existing drainage patterns and
utility corridor where appropriate.
                                                                               the existing point of discharge. No change
AO5.3 Temporary vehicular
                                                                               to the stormwater management system is
crossings of waterways must be
                                                                               proposed. Confirmation of finished
designed and constructed to be
                                                                               surface treatment is a matter for detailed
consistent with the current
                                                                               design and is capable of being
International Erosion Control
                                                                               conditioned.
Association Best Practice Book

PO6                                    AO6.1, AO6.2, AO6.3
                                                                               Complies with PO
Development is located, designed,      Stormwater runoff discharging into
                                                                               The site is presently developed and
constructed and operated to protect    High Ecological Value waters as a
                                                                               sealed, and stormwater discharges to the
and enhance environmental values       result of development causes no
                                                                               existing lawful point of discharge. The
and water quality of waterways,        increase in gross pollutants, total
                                                                               proposal does not materially alter the
wetlands, lakes, ground waters and     suspended solids, total phosphorous
                                                                               impervious area: the works are within the
drainage systems. Editor’s note:       or total nitrogen compared to a pre­­
Log in to download the original file

Code Assessment - 12 Eenie Creek Rd (RESOLVED DRAFT).pdf · 527 KB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.