OO COUNCIL Capital Schedule
for the period ending 31 March 2022
Report run date: 06-Apr-2022 16:48:28
500300 501006 500300 - Minor Capital Acquisitions 6,440 6,440 6,440 100.00%
Total Minor Plant & Equipment 6,440 6,440 6,440 100.00%
|
500551 500551 500551 - Noosa Hinterland Priority Playground - Planning & Design 4,160,752 4,130,752 3,642,550 90,922 87.55%
510059 501058 510059 - Sunshine Beach Skate Park New Shade Structure - U&R 130,137 130,137 122,926 0 94.46%
510076 510076 510076 - Lake Cooroibah Foreshore - CatD2019 50,000 31,484 629 5,114 1.26%
510079 510079 510079 - Replace Shade Shelters at Noosa Banks - Cat D2019 13,821 8,635 0 0 0.00%
510088 510088 510088 - Sunshine Beach Metal Skate Ramp Renewal 350,000 145,358 16,288 283,271 4.65%
510118 510118 510118 - Shire BBQ Renewal Program SEQCSP2124 0 0 46,178 0 0.00%
Total Parks & Playgrounds 4,704,710 4,446,365 3,828,570 379,307 81.38%
S = 501038 500888 - Cooroy Maple Street Raised Pedestrian Crossing - LGGSP 883,407 883,407 846,051 3,070
500888 95.77%
500903 500906 500903 - Tewantin, Hilton Terrace CNLGGP & Ivory Palms 109,909 82,882 108,407 412 98.63%
500919 500923 500919 - Wallace Park Pathway 5&6 - W4Q 0 0 11,050 0.00%
510050 501049 510050 - Peregian Beach Boardwalk - U&R 5,321 5,321 5,321 100.01%
510089 510089 510089 - Noosa Heads First Point-Picture Point Light CWS SEQCSP2124 60,000 44,281 42,910 71.52%
510090 510090 510090 - Sunshine Beach BelmoreTce Pathway Renewal WCS SEQCSP2124 0 0 3,236 0.00%
510096 510096 510096 - Castaways Beach Flagship Ct Missing Path Link WCS SEQCSP2124 22,000 16,271 26,812 121.87%
510097 510097 510097 - Cooroy Maple St Pathway OverlanderAv BruceHwy CWS SEQCSP2124 0 0 10,223 0.00%
510098 510098 510098 - Cooroy Tewantin Rd Missing Pathway Link WCS SEQCSP2124 0 0 2,001 0.00%
510099 510099 510099 - Noosaville Bluebell Ct Missing Pathway Link WCS SEQCSP2124 13,000 8,655 2,825 21.73%
510100 510100 510100 - Pomona Stan Topper Park Pathway Link WCS SEQCSP2124 12,000 8,654 536 447%
510101 510101 510101 - Tewantin Tinaroo Place Missing Pathway Link CWS SEQCSP2124 12,000 8,559 1,757 14.64%
510103 510103 510103 - Tewantin Memorial Park - Poinciana Avenue Pathway SEQCSP2124 0 0 0 0.00%
510116 510116 510116 - Noosa Heads Precinct West end Sofitel Boardwalk SEQCSP2124 0 0 4,086 0.00%
510123 510123 510123 - Tewantin Ernest_Goodchap St Path Linkage CWS SEQCSP2124 25,000 12,500 1,803 7.21%
510124 510124 510124 - Noosaville Swan St Pathway Koel St to WylahSt CWS SEQCSP21 24 40,000 12,500 27,902 27,273 69.76%
510125 510125 510125 - Peregian Beach Plover St Pathway Piper to Jacana SEQCSP2124 38,000 11,000 689 0 1.81%
510127 510127 510127 - Noosa Heads Park Road Temporary Pathway Removal 38,397 38,397 38,422 0 100.06%
Total Pathways & Boardwalks 1,259,034 4,132,427 1,134,032 30,755 90.07%
D
510120 510120 510120 - Public Amenities Renewal Program SEQCSP2124 200,000 60,000 133,592 75,092 66.80%
Total Public Amenities 200,000 60,000 133,592 75,092 66.80%
ns! 501 021 500957 - Shire Bus Shelter Disabled Compliant Program Annual - PTIAP 352,391 327,869 157,627 171,133
500957 44.73%
510126 501021FD02 510126 - Tewantin Furness Drive Bus Stop Pathway DDA CWS SEQCSP2124 0 0 1,757 0 0.00%
Total Public Transport Infrastructure 352,391 327,869 159,384 171,133 45.23%
0 a 035YR22 500959 - Shire Reseal & Rehabilitation Renewal Program Annual 5,339,530 3,978,592 3,913,866 1,418,885
5009 59 73.30%
510047 501045 510047 - Tewantin Bypass Stage 1 7,313,379 3,390,187 2,396,880 5,067,170 32.77%
Total Sealed Roads Network 12,652,909 7,368,779 6,310,746 6,486,055 49.88%
| at 04
510104 510104 - Detailed Design Redevelopment Cooroy Sports Complex 50,000 48,228 1,274 0 2.55%
510114 510114 510114 - Peregian Beach Skate Park Design & Construct SEQCSP2124 0 0 4,043 1,850 0.00%
510131 510131 510131 - Noosa Heads Quamby Park Tennis Court - Fencing Renewal 20,000 20,000 401 19,722 2.01%
Total Sports Ground and Facilities 70,000 68,228 5,717 21,572 8.17%
DI é
500916 500920YR22 500916 - Gympie Terrace Stormwater 593,689 262,993 4,944 0.83%
500960 500988 500960 - Shire Bioretention Basin Renewals Program Annual 75,000 34,375 0 20,277 0.00%
500972 500999 500972 - Noosaville, Project Ave Stormwater Drainage Easement Upgrade 498,404 406,306 65,832 434,737 13.21%
510025 510025 510025 - Sunshine Beach, Ross Cres Emergent Slip Repair 86,231 86,231 471,265 14,300 546.51%
510039 501036 510039 - Sunrise Beach Sobraon Street Slope Stabilisation - W4Q &LRCI 669,677 669,677 633,571 19,927 94.61%
510091 510091 510091 - Noosaville Foreshore Park Stormwater Renewals SEQCSP2124 30,000 20,000 9,210 30.70%
510122 510122 510122 - Dath Henderson Culvert Emergent Works 63,351 63,351 65,438 103.29%
Total Stormwater Drainage 2,016,352 1,542,933 1,250,260 489,241 62.01%
500622 500636 500622 - Noosa Heads Noosa Parade Road Corridor 1,847,167 605,881 894,467 2,105,533 48.42% @
510020 510020 510020 - Noosa Junction Streetscape 126,047 12,622 108,927 41,060 86.42% ©
Total Streetscapes and Road Corridors 1,973,214 618,503 1,003,394 2,146,593 50.85%
I vi aE eae of Shire Forward Planning & Design Program - Construct 400,000 296,817 319,502 62,869
500546 500546 79.88%
500679 500679 500679 - Tewantin, Hilton Tce & Ernest St Intersection Upgrade Constr 29,966 29,966 29,966 100.00%
500973 501000 500973 - Transport Strategy, Walking & Cycling Strategy &CNLG Grant 42,054 42,054 22,058 52.45%
510083 510083 510083 - Noosa Heads Bus Station Options Analysis and Concept Design 200,000 120,000 103,270 160,678 51.63%
510102 510102 510102 - Tewantin Doonella St & Memorial Ave Intersection Upgrade 275,000 34,249 20,803 772 7.56%
510128 510128 510128 - Noosa Heads, Noosa Drive Halse Lane to Sunshine Beach Rd 270,000 170,294 22,924 37,067 8.49%
Total Transport and Infrastructure Management 1,217,020 693,380 518,523 261,385 42.61%
5009 74
I
501001 500974 - Noosa Heads The
5 1 446 1 1 6 1090 4247 94 21 95 Woods Bin Storage Enclosure 15,076 15,076 14,999 0 99.49%
500976 501003 500976 - Masterplan Landfill SW Controls & Design 63,356 21,000 -16,987 55,000 -26.81%
510042 501040 510042 - Noosaville Eumundi Road Landfill Outbound Weighbridge 264,000 4,278 3,059 0 1.16%
510043 501041 510043 - Noosaville Eumundi Road Landfill Liner, Cell capping design 4,595,000 1,951,042 820,360 3,401,568 17.85%
510044 501042 510044 - Noosaville Eumundi Road Landfill Expansion of Resource Recov 25,008 24,204 8,722 7,500 34.88%
Total Waste Management 4,962,440 2,015,601 830,154 3,464,068 16.73%
Page 20 of 22See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.