2022-05-10 Services and Organisation Committee Meeting Agenda
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
SERVICES & ORGANISATION COMMITTEE MEETING AGENDA 10 MAY 2022
In addition, the third quarter of the 2021/2022 Road Reseal Program of $5.3m has delivered $1.3m
worth of works with the reseal program expenditure now totalling $3.9m. The third quarter works
included the following:
• Taine Street, Noosaville
• Lake Weyba Drive, Noosaville
• Koel Street, Noosaville
• Sea Eagle Drive, Noosaville
• Weemilah Court, Cooran
• Furness Drive, Tewantin
• Waratah Close, Tewantin
• Griffith Avenue, Tewantin
Skate Park – Ramp Renewal, Sunshine Beach
Concept design drawing of new half pipe programmed for delivery in May/June 2022
Noosa Parade Corridor Upgrade, Noosa Heads
Concept drawing of Noosa Parade programmed for delivery Feb 2022 to Oct 2022
Page 9 of 22
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.