SERVICES & ORGANISATION COMMITTEE MEETING AGENDA 10 MAY 2022
REPORT
This report is to inform Council of the overall status of the Capital Works Program at the end of
March 2022.
The report provides an opportunity to highlight and discuss projects within the program and confirm
the delivery status of projects delivered in the second quarter of the 2021/2022 financial year.
It is important to note that the financial summary provided in this report is subject to timing and
report accruals (i.e. a major project funded over multiple years may be significantly closer to
completion than the 2021/2022 financials may indicate).
1. Current Projects
The major focus in the third quarter of the 202120/22 financial year has been:
• The continued final stages of construction of major projects that have
been budgeted over multiple years;
o Rufous Street Community Centre final completion forecast early
April 2022.
o Hinterland bridge: Wahpunga Lane
• Award of project construction contracts totaling $1m that are budgeted
in 2021/2022 (Contract values noted);
o Noosa Trail 5 Upgrade – Cooran Horse Yards $63,000
o Project Avenue Stormwater upgrade $389,000
o Sunshine Beach half pipe metal skate ramp renewal $280,000
o Gallery Feasibility study $130,000
• Emergent works pre and post February 2022 flood event
o Ross Cres slop Stabilisation Repairs
▪ Pre works costs $405,000
▪ Post works as a result of flood impacts $205,000
o Sobroan Street Stormwater Realignment
▪ Post flood impact costs $65,000
• Upcoming tenders, evaluations and awards for projects also budgeted
for construction in the 21/22 financial year include:
o Cooroy Belli Creek Rd Bridge Renewal
o Peregian Beach Fire Tech lab
o Garth Prowd Bridge Renewal
o Gallery Air-conditioning Renewal (design ready)
o Sunshine Beach Noosa Aquatic Centre 25m pool shade structure
o Tewantin Doonella Bridge renewal
The Design Services team are currently designing 13 projects (*note: pathway and bus stop
programs contain multiple projects) with an estimated design value of $970,000 and estimated
construction value of $19m. The Design Services team continues to support the Delivery team in
the construction of over $20m worth of infrastructure and the disaster recovery effort.
Design output this quarter has been impacted by the movement of key staff (currently 2 vacant
positions), construction support and disaster support. Due to continued supply market shortages
the Design Team is working with Civil Operations and the Delivery Team to reprice, redesign or
complete options analysis to avoid critical material delays and recycle stored materials.
Page 8 of 22
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.