MCU23/0090 Application For Material Change Of Use – Hotel (Extension To Existing Hotel) And DBW23/0073 - Building Work (Demolition) At 118 Poinciana Ave & 26 Diyan St, Tewantin · Attachment 1 – (MCU23/0090 & DBW23/0073) - Proposed Conditions
GENERAL COMMITTEE MEETING REPORT 17 MARCH 2025
49. All retaining walls must be designed and constructed in accordance with the planning scheme
and must be certified by an RPEQ where exceeding 1.0m in height. All retaining walls that
are publicly accessible and exceed 1.0m in height must be fitted with a commercial grade
safety fence.
Damage to Services and Assets
50. Any damage caused to existing services and assets as a result of the development works
must be repaired at no cost to the asset owner at the following times:
a. where the damage would cause a hazard to pedestrian or vehicle safety, immediately;
or
b. where otherwise, upon completion of the works associated with the development.
Any repair work which proposes to alter the alignment or level of existing services and assets
must first be referred to the relevant service authority for approval.
Waste
51. The developer must provide waste storage and disposal facilities in accordance with
Planning Scheme Policy 9 - Waste Management. The facilities must include an impervious
area, within the site, correctly sized for all refuse and recycling containers and suitably
screened from public places and neighbouring properties. A bin wash area is required with a
cold-water tap, hose and drain outlet connected to sewer, via a bucket trap. The drain outlet
must be designed to prevent storm water entry to the sewerage system.
DBW23/0073 - DEVELOPMENT PERMIT FOR BUILDING WORK ASSESSABLE AGAINST THE
PLANNING SCHEME (DEMOLITION)
52. Provide a work method statement to Councils Development Assessment Manager for
endorsement prior to demolition commencing.
53. A waste management plan, in accordance with the requirements of Planning Scheme Policy
PSP9 Waste Management, is to be provided to Council for approval prior to the issue of the
development permit for building works.
Codes of development
54. Unless specifically conditioned otherwise, all works must comply with the relevant acceptable
solutions as contained in the Waste Management Code and Water Quality and Drainage
Code of the Noosa Plan.
Currency period
55. This development approval lapses if building work (demolition) has not substantially
commenced within 12 months from the date of this decision notice, unless an application to
extend the currency period is approved by Council.
Performance Bond
56. Security to the value of $20,000 must be provided to Council’s Building and Plumbing
Services prior to the issue of the development permit for building works. The security must
be in the form of a cash bond or bank guarantee, for security against satisfactory completion
of works.
Waste Management
57. Adequate area must be provided on-site for the collection and separate storage of recyclable,
non-recyclable, vegetative and hazardous materials in their specific waste streams during
removal or demolition works.
58. All waste materials must be removed from the site to avoid causing unhealthy conditions,
with the site left clean, tidy and free from any debris.