MCU23/0090 Application For Material Change Of Use – Hotel (Extension To Existing Hotel) And DBW23/0073 - Building Work (Demolition) At 118 Poinciana Ave & 26 Diyan St, Tewantin · Attachment 1 – (MCU23/0090 & DBW23/0073) - Proposed Conditions

of 9

Page text shows just the words. Original shows the document exactly as it was published.

GENERAL COMMITTEE MEETING REPORT                                                  17 MARCH 2025


49.   All retaining walls must be designed and constructed in accordance with the planning scheme
      and must be certified by an RPEQ where exceeding 1.0m in height. All retaining walls that
      are publicly accessible and exceed 1.0m in height must be fitted with a commercial grade
      safety fence.
      Damage to Services and Assets
50.   Any damage caused to existing services and assets as a result of the development works
      must be repaired at no cost to the asset owner at the following times:
      a.   where the damage would cause a hazard to pedestrian or vehicle safety, immediately;
           or
      b.   where otherwise, upon completion of the works associated with the development.
      Any repair work which proposes to alter the alignment or level of existing services and assets
      must first be referred to the relevant service authority for approval.
      Waste
51.   The developer must provide waste storage and disposal facilities in accordance with
      Planning Scheme Policy 9 - Waste Management. The facilities must include an impervious
      area, within the site, correctly sized for all refuse and recycling containers and suitably
      screened from public places and neighbouring properties. A bin wash area is required with a
      cold-water tap, hose and drain outlet connected to sewer, via a bucket trap. The drain outlet
      must be designed to prevent storm water entry to the sewerage system.
DBW23/0073 - DEVELOPMENT PERMIT FOR BUILDING WORK ASSESSABLE AGAINST THE
PLANNING SCHEME (DEMOLITION)
52.   Provide a work method statement to Councils Development Assessment Manager for
      endorsement prior to demolition commencing.
53.   A waste management plan, in accordance with the requirements of Planning Scheme Policy
      PSP9 Waste Management, is to be provided to Council for approval prior to the issue of the
      development permit for building works.
      Codes of development
54.   Unless specifically conditioned otherwise, all works must comply with the relevant acceptable
      solutions as contained in the Waste Management Code and Water Quality and Drainage
      Code of the Noosa Plan.
      Currency period
55.   This development approval lapses if building work (demolition) has not substantially
      commenced within 12 months from the date of this decision notice, unless an application to
      extend the currency period is approved by Council.
      Performance Bond
56.   Security to the value of $20,000 must be provided to Council’s Building and Plumbing
      Services prior to the issue of the development permit for building works. The security must
      be in the form of a cash bond or bank guarantee, for security against satisfactory completion
      of works.
      Waste Management
57.   Adequate area must be provided on-site for the collection and separate storage of recyclable,
      non-recyclable, vegetative and hazardous materials in their specific waste streams during
      removal or demolition works.
58.   All waste materials must be removed from the site to avoid causing unhealthy conditions,
      with the site left clean, tidy and free from any debris.
Log in to download the original file

ATTACHMENT 1 – (MCU23_0090 & DBW23_0073) - PROPOSED CONDITIONS.pdf · 111 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.