Town Planning Assessment Report
Attached to the e-mail Operational Works Application - DA Form 1 - Town Planning Report - Global Stability Assessment Report - Earthworks Compaction Report - Erosion and Sediment Control Plan - 36 Tunba Court Cooroy Mountain.
Figures 1c and Figure 2a of the Global Stability Assessment report provided at Appendix B and as detailed
in Figures 3 and 4 below illustrate the extent of the proposed work.
Figure 3 - Benched Cut Batter
Figure 4 - Flattened Fill Batter
Please refer to Appendix A – Proposal Plans for further details.