Skip to the record
Trusted by locals. Built for Noosa.

Original source · versioned page text

Town Planning Assessment Report

Attached to the e-mail Operational Works Application - DA Form 1 - Town Planning Report - Global Stability Assessment Report - Earthworks Compaction Report - Erosion and Sediment Control Plan - 36 Tunba Court Cooroy Mountain.

of 13

Page text shows just the words. Original shows the document exactly as it was published.

Figure 1 - Topographic plan of existing earthworks for shed pad




Figure 2 - Section plan of existing earthworks for shed pad


Some further rectification works will be carried to both the batters of the upslope and downslope to achieve
a Factor of Safety of 1.5.

To the cut batter, this will involve providing a 2m wide bench where the existing cut batter height exceeds
4m. The lower batter is to be no higher than 4m and the upper batter is to be no higher than 3.5m. Both
batters are to be no steeper than 380 in slope angle, and are to be separated by a bench with a minimum
width of 2m.

To the fill batter, this will involve flattening of the existing fill batter to 2.5H:1V
                                                                                                  Page 4 of 13
Log in to download the original file

Town Planning Assessment Report.pdf · 2.9 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.