Town Planning Assessment Report
Attached to the e-mail Operational Works Application - DA Form 1 - Town Planning Report - Global Stability Assessment Report - Earthworks Compaction Report - Erosion and Sediment Control Plan - 36 Tunba Court Cooroy Mountain.
Figure 1 - Topographic plan of existing earthworks for shed pad
Figure 2 - Section plan of existing earthworks for shed pad
Some further rectification works will be carried to both the batters of the upslope and downslope to achieve
a Factor of Safety of 1.5.
To the cut batter, this will involve providing a 2m wide bench where the existing cut batter height exceeds
4m. The lower batter is to be no higher than 4m and the upper batter is to be no higher than 3.5m. Both
batters are to be no steeper than 380 in slope angle, and are to be separated by a bench with a minimum
width of 2m.
To the fill batter, this will involve flattening of the existing fill batter to 2.5H:1V
Page 4 of 13
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.