Town Planning Assessment Report
Attached to the e-mail Operational Works Application - DA Form 1 - Town Planning Report - Global Stability Assessment Report - Earthworks Compaction Report - Erosion and Sediment Control Plan - 36 Tunba Court Cooroy Mountain.
Table 6.1.1 - Assessment against key benchmarks
Earthworks Code
Performance Outcomes Acceptable Outcomes Compliance
Drainage AO1 AO1 - Complies
PO1 Filled or excavated areas have a The proposed earthworks are in a
Finished surface levels ensure land minimum gradient of 0.5% and drain rural environment. They will be free
is free draining. to Council’s stormwater infrastructure draining and achieve a minimum
where available, or where stormwater gradient of 0.5%.
infrastructure is not available, toward
the street.
Hydraulics No acceptable outcome provided PO2 - Complies
PO2 The proposed earthworks will not
Change to the levels on site do not cause adverse impacts to the
have an adverse impact on the flooding and drainage
flooding and drainage characteristics off-site.
characteristics off-site.
Geotechnical considerations AO3.1 AO3.1 - Complies
PO3 Filling works are undertaken in Filling works have been
Earthworks do not result in accordance with Council’s Planning undertaken in accordance with
geotechnical instability on-site or to Scheme Policy PSP6 Engineering PSP6 including that:
nearby premises. design standards - roads, drainage + they have been supervised by a
and earthworks. geotechnical engineer to ensure
an appropriate compaction rate;
AO3.2 + an erosion and sediment control
Where the filling is for residential, management plan has been
commercial or industrial purposes the established to ensure that no
works comply with Australian sedimentation occurs
Standard - Guidelines for earthworks downstream; and
on commercial & residential + the works have been monitored
development. by Aussie Environmental.
Local amenity
PO4 AO4.1 AO4.1 - Complies
Undertaking earthworks does not The following control measures are Appropriate control measures
adversely impact on the amenity of implemented— have been implemented by Aussie
the local area by way of dust, noise a) regular water spraying of Environmental to ensure that the
or visual amenity. exposed areas to suppress dust; works will not result in dust or other
b) provision of dust stabilised or nuisance issues.
sealed internal roads;
c) protective covering of exposed
areas that are left for more than 2
weeks; and
d) unless a development permit
provides otherwise, disturbed
areas are revegetated using
species identified in Council's
Planning Scheme Policy PSP2
Landscaping.
AO4.2 AO4.2 - Complies
Earthworks are undertaken only Earthworks will not be undertaken
during the hours of 7:00am to outside of the specified hours
6:00pm, Monday to Friday and
7:00am to 3:00pm on Saturday. No
work is undertaken on Sunday or
public holidays.
Page 9 of 13
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.