Town Planning Assessment Report

Attached to the e-mail Operational Works Application - DA Form 1 - Town Planning Report - Global Stability Assessment Report - Earthworks Compaction Report - Erosion and Sediment Control Plan - 36 Tunba Court Cooroy Mountain.

of 13

Page text shows just the words. Original shows the document exactly as it was published.

Vegetative waste                          AO5.1                                         AO5.1 - 5.4 - Not Applicable
PO5                                       Cleared vegetation is transported off-        The earthworks did not require
Vegetation cleared from a                 site for disposal in an approved green        clearing of vegetation.
development site is disposed of in        waste disposal facility.
an environmentally responsible
manner.                                   AO5.2
                                          Cleared vegetation is mulched on-
                                          site and reused for landscaping of the
                                          finished development.

                                          AO5.3
                                          Cleared vegetation is disposed of for
                                          the purpose of firewood.

                                          AO5.4
                                          Disposal of vegetative waste by
                                          burning off is avoided.

Managing contamination risk               AO6.1                                         AO6.1 - Complies
PO6                                       Fill material is solid clean earth, free of   All material was contained within
Materials used as fill are suitable for   putrescible or refuse                         the development footprint.
development and future use of the         material, vegetation, acid sulfate
land and filling or excavation works      soils, building or construction material
do not result in the contamination of     or other material or contaminants.
land.
                                          AO6.2                                         AO6.2 - Complies
                                          The site is not on the contaminated           The site is not on the contaminated
                                          land register.                                land register.

Haulage activity and amenity              No acceptable outcome provided                PO7 - Not Applicable
PO7                                                                                     No material will be transported to
Haulage of material to and from                                                         and from the site.
a site ensures—

a) minimal disturbance to
   neighbouring properties and
   properties along the haulage
   route; and
b) Council’s road infrastructure
   including pavements is not
   adversely affected.

Extent of earthworks                      AO8                                           AO8 - Complies
PO8                                       All earthworks, including cut and fill        All material will be contained within
The layout of the development             batters, retaining walls and the like are     the development footprint.
provides adequate, clearly defined        contained within the subject site.
and easily accessible—

a) on-site vehicle parking and
   manoeuvring areas; and
b) loading and manoeuvring areas
   for delivery and service
   vehicles.



Sloping sites                             AO9                                           PO9 - Performance Outcome
PO9                                       Cut or fill is less than 1.5 metres in        The cut and fill depths exceeds
On sloping sites development              depth relative to the natural ground          1.5m in height as detailed on the
follows the natural landform              level.                                        proposal plans. The cut and fill

                                                                                                                 Page 10 of 13
Log in to download the original file

Town Planning Assessment Report.pdf · 2.9 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.