Skip to the record
The only place to find full transcripts.

Council archive · source document

Decision Notice - Change to an Existing Approval - 010.2007.00000836.002 [As Published] · 142007.836.02

of 10

Text shows just the words. Original shows the document exactly as it was published.

                                             -6-                                 2007/836



37.    Certification of the completed works must be provided by the supervising engineer,
       together with certification from the Hydraulic Engineer that the completed works
       conform with all aspects of the drainage design for the development.
38.    Prior to acceptance of civil works to become Council assets "On Maintenance", the
       lodgement of satisfactory “As Constructed” records shall be submitted to Council.
       As Constructed drawings and data shall be certified by a qualified experienced Civil
       Engineer (RPEQ) for design intent, and a Licensed Surveyor shall certify the cadastre
       and the location, level and type of all services and structures. All of which shall be
       submitted to Council for checking and for Council’s records.
       The data must fully detail levels for all engineering works including but not limited to
       drainage structures, finished ground levels and pavement surface levels. The data
       shall be submitted in the Asset Design and As Constructed (ADAC) digital format.
       (Guidelines on the use of ADAC are available at www.adac.com.au) and Council’s
       Planning Scheme Policy 5 – Engineering Design Standards – Roads, Drainage and
       Earthworks.
       Approval of works shall not be granted until all As Constructed information has been
       supplied and accepted by Council.
39.    A 5% cost of works to become Council assets or $1,500 bond (whichever is the
       greater) will be imposed on construction works during the maintenance period, which
       is a minimum period of 12 months duration. Such bond must be lodged by, and shall
       only be accepted from the Developer for the works.
40.    The works to become Council assets will not be accepted "On Maintenance" until the
       landscaping is completed.
41.    These works are also to be in compliance with the relevant conditions of
       Development Permit No. 23737 DA.
42.    Notwithstanding that Council has checked the plans with due care, where it is found
       during construction that variations from Council's standards exist, then Council
       standards shall apply.
5      REFERRAL AGENCY CONDITIONS
The referral agencies applicable to this application are:

 Referral Trigger          Referral          Referral Agency      Referral Address
                           Status

 Nil

6      APPROVED PLANS/DOCUMENTS
The approved plans and / or documents for this development approval are listed in the
development assessment conditions.
7      ADVISORY NOTES
The following Advisory Notes are for information purposes only and do not form conditions
of approval:

Used in these records

About this file

File size
63 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Decision Notice - Change to an Existing Approval - 010.2007.00000836.002 [As Published].pdf · 63 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.