Decision Notice - Change to an Existing Approval - 010.2007.00000836.002 [As Published] · 142007.836.02
-5- 2007/836
29. The development of the site shall be carried out in such a manner as to prevent dust
and/or sand nuisance to residents and/or tenants in the vicinity of the development.
30. Construction work and other associated activities are permitted only during the hours
of 7.00 am and 6.00 pm Monday to Saturday. No work is permitted on Sundays or
public holidays, except where extended hours are approved by the Manager-Land
Development or his nominee.
31. All signage, including that for safety during construction shall be in accordance with
the Manual of Uniform Traffic Control Devices and Traffic Infrastructure (Roads) Act.
32. Safe pedestrian access on Elizabeth Street shall be maintained at all times. Should
footpath / road closures be necessary to carry out construction works, Council’s
Construction Technical Officer (ph 0410 512 505) must be notified prior to the
proposed closure.
33. Sediment and erosion control measures must be in place prior to works commencing.
If such measures are not in place or are not satisfactory, “on the spot “fines may be
issued. Such fines can be issued if sediments from the site are found to enter or have
the potential to enter Council’s stormwater system or natural waterways. Although the
sediment and erosion control measures have been approved on drawing No 1740-0-2
dated 11/05/07 by Construction Hydraulic, Council’s Manager – Land Development
may request further controls to be installed should approved measures be inefficient.
34. The owners of the subject property shall maintain the grease/oil arrestor pits/gross
pollutant traps in accordance with the manufacturers specifications.
35. The owners of the subject property shall inspect the grease/oil arrestor pits/gross
pollutant traps on a weekly basis and after each storm event.
The owners of the subject property shall enter into an ongoing maintenance contract
with a Registered Contractor to clean and maintain the grease/oil arrestor pits/gross
pollutant traps on a regular three monthly cycle and on a “On Call” basis in the case
of an emergency.
The management and maintenance of the grease/oil arrestor pits/gross pollutant
traps shall be included in the Community Management Scheme for the completed
development.
36. All stormwater drainage lines including private drainage lines (also known as inter-
allotment drainage lines) or as otherwise approved by Council’s Manager of Land
Development shall be inspected by closed circuit television (CCTV) at the completion
of all works and immediately prior to acceptance ‘On Maintenance’. Council’s
Construction Technical Officer shall be advised of the timing of this inspection.
A report of the CCTV inspection, including photographic records (which includes
photos & video recordings burnt onto a CD) of the inspection shall be submitted to the
Council for approval. Any defects or substandard works shall be recorded and
accurately illustrated on the drainage plan showing the location of the defect(s).
Substandard work will not be accepted ‘On Maintenance’ and must be rectified at the
applicants expense with a further CCTV inspection arranged once the rectification
works have been completed.
To this extent all CCTV inspections, including any additional inspections necessary
following defect identification and rectification, shall be entirely at the applicant’s
expense. Any costs incurred by Council in reviewing the CCTV inspection results
shall also be borne by the applicant.
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Decision Notice - Change to an Existing Approval - 010.2007.00000836.002 [As Published]Related documentApplication case desk ↗
About this file
- File size
- 63 KB (small file)
- File type
No other editions are linked here.