Council archive · source document
Response to Information Request - OPW12/0222
This schedule will include a weekly inspection of the modified pit and the first-flush diverter and cleaning out and general maintenance when necessary. An additional maintenance inspection will be carried out after each storm event. This will be in addition to the current maintenance schedule of the network generally which includes the gross pollutant traps installed in the distribution pit and the individual soakage pits. Please contact me if you require any further information.
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Response to Information Request - OPW12/0222Related documentApplication case desk ↗
About this file
- File size
- 3.6 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.