RFI - Attachment 4A - Response by Native Foresters

of 11

Page text shows just the words. Original shows the document exactly as it was published.

 Native Foresters
  Natural Resource Management Consultants

 10th December 2023


 Cody Johnston and Mark Borgert
 Noosa Council

 RE: Response to Information Request – Noosa Landfill Expansion Project – Environmental
     Items

 Native Foresters has been requested to provide updated information regarding the Information
 Request received from Noosa Council on the 23/11/2023. Shane Adamson has nominated
 that responses are required to the following items:

 Item 6 – Refer Updated Flora and Fauna Assessment -Noosa Landfill – Northern Section –
 Revision 4; which provides updated responses to the Biodiversity Waterways and Wetlands
 Overlay Code.

 Item 7 – It is determined that the State Government Supported Infrastructure Koala Policy
 2017 applies to the development. Refer to Table 1 and 2 below for an assessment of the
 application against this policy and the updated Flora and Fauna Assessment -Noosa Landfill
 – Northern Section – Revision 4.

 Item 8 – It is determined that the Paperbark Wetland in the subject site does not meet the
 criteria for a EPBC Act Threatened Ecological Community (Coastal Swamp Sclerophyll
 Forest of NSW and SEQ), for the following reason:
    •    The subject area does not meet the patch condition and threshold criteria within the
         Coastal Swamp Sclerophyll Forest TEC Conservation Advice due to the high level of
         weeds in the ground layer. Whilst the criteria for dominant species and patch size is met
         (i.e., size >0.2ha that is contiguous with a large patch (EPBC Act,1999). As a result, is not
         protected under the EPBC criteria.

  Item 9 – As noted above it is determined that the MNES listed Coastal Swamp Sclerophyll
  Forest of NSW and SEQ is not present onsite. It is also determined that the site is not providing
  breeding or foraging habitat for the MSES listed Glossy Black Cockatoo for the following
  reasons:
    •    No hollow bearing trees or trees showing early stages of hollow formation were observed
         in the survey area that would provide suitable breeding habitat for Glossy Black
         Cockatoo.
    •    No Glossy Black Cockatoo food trees of the Casuarina or Allocasuarina spp are present
         onsite.

Refer to the updated MNES/MSES Assessment – (Noosa Landfill RRC -291123 - Revision 2)
for the project.




Noosa Landfill & RRC – Response to RFI – Environmental Items (Dec 2023)                            1
Log in to download the original file

RFI - Attachment 4A - Response by Native Foresters.pdf · 486 KB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

Full text of the other 10 pages

Page 2

         TABLE 1:              Assessment of Project against State Governments Supported Infrastructure Koala Policy 2017
Column 1:                                                                          Column 2:                                                       Column 3:
Requirements that apply to all Government       RESPONSE                           Government      Supported        Infrastructure   RESPONSE      Self-Assessment Criteria                                       SELF     –
Supported Infrastructure development in SEQ                                        development in a KHA that is exempt from the                                                                                   ASSESSMENT
                                                                                   Self-Assessment Criteria of Column                                                                                             RESPONSE
1.     Where possible, development avoids       Complies                           1.    Development in a State Development          N/A           Development in an area that is both a KPA and a KHA            See Table 2
       fragmenting KHA within the land to       The clearing is on the edge of           Area.                                                     1. Where interfering with koala habitat, occurs, public        assessment
       which the development applies.           retained vegetation and                                                                                sector entities, in addition to any relevant criteria of   below.
                                                cleared areas.                                                                                         Column 1, must also self-assess against the
                                                                                                                                                       requirements in Table 2.
2.     Where possible, development does         Complies                           2.    Development for a Coordinated               N/A           Development in an area that is a KHA outside a KPA             N/A
       not impede or restrict the movement      The vegetation is an area                Project.                                                  2. Where interfering with koala habitat is unavoidable,
       of koalas within the land to which the   1.02ha which is “jutting” into                                                                         development in a KHA, in addition to any relevant
       development applies and provides         the landfill site; and currently                                                                       criteria of Column 1, must:
       safe koala movement measures             does not provide a corridor or                                                                         a.      minimise interfering with koala habitat; and
       between highly connected patches of      link from the remaining
       retained KHA.                            vegetation on site (to the east
                                                of the landfill) to another
                                                patch of vegetation.
3.     Clearing of koala habitat trees must     Complies                           3.   Development in a declared Priority           N/A                b.    where possible, mitigate any impacts that           N/A
       be carried out in a way that complies    Council will clear from the             Development Area or a declared Provisional                            interfere with koala habitat values; and
       with sequential clearing conditions.     landfill towards the retained           Priority Development Area.
                                                vegetation.
4. Development must ensure that:                Complies                           4.   Development that involves interfering with   N/A                c.     where interfering with koala habitat results in    N/A
      a. measures are taken in                  A Wildlife Spotter Catcher              koala habitat to:                            Proposed                  a significant residual impact, deliver an
          construction practices to not         experienced in koala spotting           a.    a total area of 500m2 or less; or      clearing is               offset:
          increase the risk of death or         and relocating, will be                 b.    a total of 12 non juvenile koala       1.02ha                     i.     in accordance with the requirements
          injury to koalas; and                 required during all clearing                  habitat trees or less on the land to                                     of the current Queensland
      b. native vegetation in an area           works.                                        which the development applies.                                           Environmental Offsets Policy or
          identified by a proponent to be       Works        will    also    be
          retained as a safe koala              undertaken in accordance
          movement measure is                   with a CEMP.
          progressively restored if it must
          be impacted during site
          operations.                           N/A




         Noosa Landfill & RRC – Response to RFI – Environmental Items (Dec 2023)                                                                                                               2

Page 3

Column 1:                                                               Column 2:                                                            Column 3:
Requirements that apply to all Government     RESPONSE                  Government         Supported       Infrastructure     RESPONSE       Self-Assessment Criteria                                    SELF     –
Supported Infrastructure development in SEQ                             development in a KHA that is exempt from the                                                                                     ASSESSMENT
                                                                        Self-Assessment Criteria of Column                                                                                               RESPONSE
5.       Where appropriate in the context     N/A                       5.    Development that involves interfering with      N/A                     ii.      where the public sector entity has a      N/A
         of the landscape, landscaping                                        koala habitat where the development is for                                       pre-existing offset, the offset must be
         activities provide food, shelter                                     necessary fire management.                                                       delivered in in accordance with the
         and movement opportunities for                                                                                                                        requirements of the current
         koalas consistent with the site                                                                                                                       Queensland Environmental Offsets
         design.                                                                                                                                               Policy with the exception of the offset
                                                                                                                                                               site location preferences; or
                                                                                                                                                     iii.      as an alternate compensatory action,      N/A
                                                                                                                                                               where the development is for transport
                                                                                                                                                               infrastructure, and if the alternate
                                                                                                                                                               compensatory action will achieve a
                                                                                                                                                               conservation outcome equal to, or
                                                                                                                                                               greater than, the conservation
                                                                                                                                                               outcome that would otherwise be
                                                                                                                                                               achieved through the delivery of a
                                                                                                                                                               land-based offset under the current
                                                                                                                                                               Queensland Environmental Offsets
                                                                                                                                                               Policy
                                                                        6.    Development that involves interfering with      N/A            3.   Clearing of koala habitat trees in a KHA are           Complies
                                                                              koala habitat to remove or reduce a                                 undertaken under the guidance of a koala spotter       Council       will
                                                                              foreseeable, imminent or ongoing:                                   where koala habitat trees have a trunk of a            undertake
                                                                              a. risk of serious personal injury; or                              diameter of more than 10cm at 1.3m above the           clearing       in
                                                                              b. risk of damage to Government                                     ground.                                                accordance
                                                                                  Infrastructure or private property; or c.                                                                              with a CEMP
                                                                                  risk to public safety.                                                                                                 and a Wildlife
                                                                                                                                                                                                         Spotter
                                                                                                                                                                                                         Catcher will be
                                                                                                                                                                                                         present during
                                                                                                                                                                                                         all clearing.
                                                                        7.    Interfering with koala habitat where it is      N/A
                                                                              necessary to undertake maintenance work         New landfill
                                                                              or repair work on Government                    area
                                                                              Infrastructure.                                 proposed.

                                                                        8.    Interfering with koala habitat where it is      N/A
                                                                              necessary to undertake retrofit work on
                                                                              existing transport infrastructure to install
                                                                              koala mitigation or management structures.




        Noosa Landfill & RRC – Response to RFI – Environmental Items (Dec 2023)                                                                                                       3

Page 4

Column 1:                                                               Column 2:                                                                Column 3:
Requirements that apply to all Government     RESPONSE                  Government           Supported          Infrastructure   RESPONSE        Self-Assessment Criteria       SELF     –
Supported Infrastructure development in SEQ                             development in a KHA that is exempt from the                                                            ASSESSMENT
                                                                        Self-Assessment Criteria of Column                                                                      RESPONSE
                                                                        Commonwealth EPBC Act obligations                        N/A
                                                                        9.    Development that involves interfering with
                                                                              koala habitat where the development is
                                                                              identified as having, or is likely to have, a
                                                                              significant impact on a matter of national
                                                                              environmental significance and is
                                                                              subsequently determined as a controlled
                                                                              action by the Commonwealth Government
                                                                              under the Environmental Protection and
                                                                              Biodiversity Conservation Act 1999,
                                                                              provided the assessment decision requires
                                                                              that a koala offset be delivered
                                                                        10. Development that:                                    N/A
                                                                              a.      was assessed against the
                                                                                      requirements of the previous policy        It is noted
                                                                                      and the development has                    that      the
                                                                                      commenced; or                              application
                                                                              b.      is submitted for approval or received      to Council
                                                                                      an approval to proceed and funding         was
                                                                                      approval for the development, issued       withdrawn
                                                                                      by the Queensland Cabinet Budget           and       has
                                                                                      Review Committee or other project-         been
                                                                                      specific governing body, relevant          resubmitted,
                                                                                      Minister or Federal Government             but SARA
                                                                                      including being listed on Qld              has
                                                                                      Transport Roads Implementation             previously
                                                                                      Program, within 12 months of the           approved
                                                                                      commencement of this policy; or            the works.
                                                                              c.      received a development approval,
                                                                                      issued prior to the commencement of
                                                                                      this policy, as a result of a
                                                                                      development assessment process
                                                                                      under the Planning Act 2016 or other
                                                                                      relevant Act.




        Noosa Landfill & RRC – Response to RFI – Environmental Items (Dec 2023)                                                                                             4

Page 5

          TABLE 2:              Self-Assessment Criteria where interfering with koala habitat in an area that is both a KPA and a KHA, is unavoidable
Public Sector Entities must:                                                RESPONSE
     1.    Minimise interfering with koala habitat                          The proposed clearing is required to extend the landfill facility in accordance with the Noosa Council Master Plan for the Noosaville Waste Management Facility.
                                                                            Lot 77 SP298776 is 322.13 hectares in total and the landfill use currently has an approximate area of 49 hectares (i.e. 15% of Lot 77). The site contains
                                                                            approximately:
                                                                                 •    235 hectares of Core KHA, and
                                                                                 •    31 hectares of Locally refined KHA.

                                                                            The works will result in impacting:
                                                                                 •    0.21 hectares of Core KHA, and
                                                                                 •    0.81 hectares of Locally refined KHA.
                                                                                 •    A total of 1.02 hectares of mapped KHA (which equates to impacting approximately 0.4% of the mapped KHA within Lot 77).
     2.    To the best extent possible mitigate any impacts that            As detailed in Table 2 and Section 4 of Impact Assessment Report for MNES & MSES by Native Foresters dated 10th December 2023 (Doc. No.: 220716-
           interfering with koala habitat has on koala values.              MNES/MSES- Rev 3) there are a number of mitigation actions proposed to reduce impacts to koala habitat, as summarized below:
                                                                                 •     Fauna spotter catcher to undertake pre-clearance survey.
                                                                                 •     Clearing supervised by a Fauna spotter catcher
                                                                                 •     Clearing to be sequential as outlined in NCA 1992 requirements.
                                                                                 •     Clearing area to be delineated prior to work and no entry to adjacent protected vegetation by personnel or machinery is allowed during works.
                                                                                 •     If possible, works will occur outside breeding season.
                                                                                 •     Machinery hygiene protocol enforced during works to reduce potential to spread weeds.
                                                                                 •     Weed management plan within retained vegetation to ensure Singapore daisy infestation is controlled, as well as other RIP’s.
     3.    Ensure that, where interfering with koala habitat results in a
           significant residual impact, and offset if delivered:
                a.    at a multiplier of 6 (unless the offsets calculator   It is proposed to establish a total rehabilitation area of 1.8 hectares to mitigate impacts to Koala habitat. The rehabilitation will involve:
                      is a greater amount) and otherwise in                        •    A dedicated Koala Tree Offset planting for Lot 77 which will nominate an offset in suitable habitat which is larger than the koala habitat to be cleared
                      accordance with the requirements of the                           of 1.02ha. The rehabilitation area is to be designed to improve and or create vegetated Koala movement corridors and provide for the offset of koala
                      Queensland Environmental Offsets Policy at the                    trees.
                      time of the project approval; or                             •    Within the Koala rehabilitation works a minimum of 0.21ha of designated revegetation aimed to achieve RE 12.5.3 (Eucalyptus racemosa subsp.
                                                                                        racemosa woodland on remnant Tertiary surfaces (DES, 2022), to mitigate the impacts to Endangered RE.

                                                                            As a significant residual impact is not relevant for this proposed clearing, the requirement for a 6 to 1 offset is not necessary. Council is proposing a 1.8 ha
                                                                            Offset for the 1.02 ha of area been cleared.




          Noosa Landfill & RRC – Response to RFI – Environmental Items (Dec 2023)                                                                                                                          5

Page 6

           b.    at a multiplier of 6 (unless the offsets calculator   “as above”
                 is a greater amount) and otherwise in
                 accordance with the requirements of the
                 Queensland Environmental Offsets Policy at the
                 time of the project approval, except for the offset
                 site location preferences if the public sector
                 entity has a pre-existing offset; or
           c.    as an alternate compensatory action, where the        N/A
                 development is for Transport Infrastructure, and
                 the alternate compensatory action includes:
                        i. the design, prior to the
                           commencement of impacts, of a
                           Koala Management Plan that:
                            a)    demonstrates that the alternate      N/A
                                  compensatory action will deliver
                                  a conservation outcome equal
                                  to, or greater than, would
                                  otherwise be achieved through
                                  the delivery of a land-based
                                  offset in 3 (a) or (b) above; and
                            b)    demonstrates that the alternate      N/A
                                  compensatory action is based
                                  on proven scientific methods
                                  and contemporary data; and
                            c)    involves an assessment of the        N/A
                                  number of koalas at risk from
                                  the development;
                            d)    demonstrates how individual          N/A
                                  koala welfare will be managed,
                                  i.e. how will koalas be
                                  protected during the
                                  development.
4.    Ensure clearing of koala habitat trees in a KHA are              Complies
      undertaken under the guidance of a koala spotter where           Council will undertake clearing in accordance with a CEMP and a Wildlife Spotter Catcher will be present during all clearing.
      koala habitat trees have a trunk of a diameter of more than
      10cm at 1.3m above the ground.




     Noosa Landfill & RRC – Response to RFI – Environmental Items (Dec 2023)                                                                                                                       6

Page 7

Item 11 - The following measures will be implemented to minimise and mitigate the impacts
on Ecologically Important Areas (EIA) onsite:

        •    Establishment of a total rehabilitation area of 1.8ha to mitigate the combined impacts to
             Koala Habitat and Endangered RE 12.5.3, which is designed to include the following:

                ➢ Provision of a dedicated Koala Tree Offset planting for Lot 77 which will provide an
                  area of 1.8ha located within the Landfill Facility to offset the 1.02ha of land to be
                  cleared. The rehabilitation area is to be designed to improve and or create
                  vegetated Koala movement corridors and provide for the 3:1 offset of koala trees
                  where 3 trees are planted for each 1 cleared.
                ➢ Within the Koala rehabilitation works a minimum of 0.21ha of designated
                  revegetation aimed to achieve RE 12.5.3 - Eucalyptus racemosa subsp. racemosa
                  woodland on remnant Tertiary surfaces (DES, 2022), to mitigate the impacts to
                  Endangered RE.

    •       Preparation and implementation of a Site Weed Management Plan which includes weed
            management in areas of retained vegetation onsite, and within the landfill site where
            weeds are likely to start encroaching i.e., Singapore daisy from the green waste areas of
            the landfill. Emphasis will be placed on undertaking weed control works within the buffer
            within the landfill area adjacent vegetation; retained vegetated areas adjacent to existing
            landfill on Lot 77 SP298776; and areas within proximity to mapped watercourses. The
            Site Weed Management Plan is to inform the Site Based Management Plan for the landfill
            operations.

    •       A Koala Spotter Catcher will be required to work through the area prior to commencement
            of works and during clearing to relocate any fauna found, to suitable undisturbed habitat.

    •       Clearing works will be undertaken in a sequential manner beginning in cleared areas and
            moving towards areas of retained vegetation to facilitate the movement of Koala and other
            fauna out of the works impact zone.

    •       Site design does not change drainage patterns in relation to the Koala breeding habitat
            contained within the impact area. All stormwater flows from the landfill and access roads
            are to be directed to a sediment control pond / biobasin or discharge to the south of the
            site, away from the remnant vegetation and wildlife habitat area.

    •       Works to comply with provisions of Construction Environmental Management Plan
            (CEMP) which details the methodology for clearing works.

    •       A Stormwater Management and Erosion and Sediment Control Plan will be implemented
            during the construction phase of operation, including water quality monitoring
            requirements. A whole of site Stormwater Management Plan is to be developed to inform
            the Site Based Management Plan to be in place during the landfill operation phase.
    •       Site management to conduct regular site inspections during landfill operations in
            accordance with the Site Based Management Plan. This includes general site inspections
            and audits against approval conditions and standard procedures.

    •       Construction quality assurance will be implemented during construction of the landfill
            facility to provide confidence that the construction meets the design requirements and
            specifications.

 Noosa Landfill & RRC – Response to RFI – Environmental Items (Dec 2023)                        Page|7

Page 8

          •    Additional / alternative environmental requirements to be implemented using adaptive
               management principles as required.

     Item 12 - The new HES Basin and RRA pad will be setback from the adjacent vegetation in
     order to allow for maintenance of the grassed buffer zone between the infrastructure and the
     adjacent retained bushland. This will allow for the implementation of a weed free maintenance
     zone to ensure that there is no transmission of weed species or other contaminants associated
     with the operation of the new Landfill infrastructure. The site Weed Management Plan will also
     ensure that existing weed infestations are properly eradicated with follow up monitoring and
     treatments as specified, in the retained vegetation adjacent to the landfill.

     Item 13 - Refer to the updated Flora and Fauna Assessment -Noosa Landfill – Northern
     Section – Revision 4 by Native Foresters.

    Item 14 - An assessment of impacts on the flora and fauna communities on the site associated
    with potential changes to the natural surface water and ground water hydraulic regimes was
    undertaken by Native Foresters and Dr Ed Meyer (amphibian specialist) Refer Noosa Landfill
    Expansion – Flora and Fauna Survey and Assessment of Impacts on adjacent ecosystems –
    Native Foresters - Document No: 190707-FF – Revision 3. Relevant information from the report
    is provided below:

     Groundwater Level Changes Impacts - Flora:

          •    Potential fracture/breaching of a shallow, indurated layer with potential impacts on
               moisture-dependent species in the lower strata of adjacent ecosystems.

          •    Moderate impacts to RE 12.3.13
              o Melalueca communities typically have standing water on the surface for three months
                 of the year. Any desiccation resulting from groundwater lowering may lead to a decline
                 in sedges and a shift towards less water-demanding grasses in the understorey. The
                 Melaleucas in the canopy will persist in drier conditions.

•     All adjacent vegetation and soil may be affected by the groundwater drainage system outflow.
      Areas that provide the receiving environment for groundwater flows (RE12.5.3/12.5.4/12.3.13)
      may become wetter over time with resulting impacts on community structure i.e. the understorey
      may become more dense (shrubs and sedges) and composition i.e. more Melaleucas.

      Surface water Changes Impacts - Flora:

      •       Moderate impacts for RE12.5.3 and 12.5.4 as detailed below:
              o Localised waterlogging favouring wet sclerophyll/Melaleuca species around
                 stormwater drain areas and discharge outlets.

              o    Shift in vegetation community composition towards species adapted to wetter
                   conditions, such as Melaleuca quinquenervia and sedges, reducing recruitment of dry
                   sclerophyll species, predominantly in the understorey. As the canopy species which
                   define the ecosystem type are likely to persist, this shift to a wetter understorey would
                   not constitute effective clearing under the Vegetation Management Act 1999.
              o    Increased growth of ground cover species assisted by increased soil moisture, with
                   resultant increases in fire fuel loads and more intense fire events. Manage with a Site
                   Bushfire Plan.

     Noosa Landfill & RRC – Response to RFI – Environmental Items (Dec 2023)                          Page|8

Page 9

          o    Introduction of nutrients and propagules of invasive plant species into typically nutrient
               poor soils, leading to an increase in invasive plant species which will need to be
               managed through active and ongoing weed control operations.

  •       Moderate impacts for RE12.3.13 as detailed below:
          o Increased/intermittent surface water/ stormwater inputs to the north of the works
             impact area and the closed heathland / wetland Land Zone 3 ecosystems that occur
             there, are likely to lead to:
              ▪ Changes in water quality north of the works impact area (i.e. increase in pH,
                 increase in nutrient concentrations);
              ▪ Changes to soil chemistry (i.e. altering soil pH levels to a less acidic state);
              ▪ Changes in vegetation community structure favouring denser understorey of
                 sedges and ferns.
          o Intensification and further spread of existing weed outbreaks which will need to be
             managed through active and ongoing weed control operations.
                     .
The following impacts and potential impacts to native fauna from landfill expansion works have
been identified:

Groundwater Level Changes Impacts - Fauna:

      •    Excavation for the infrastructure may potentially breach/fracture any indurated material
           underlying areas of shallow ‘perched’ groundwater, reducing surface expression of
           perched groundwater. This could be detrimental to Swamp Crayfish and/or Wallum Froglet
           inhabiting these areas.
      •    Areas that receive inputs from the groundwater drainage management system may
           become wetter over time, with resulting changes in species composition and vegetation
           structure. Grasses and dry sclerophyll species may be replaced by sedges and wet-
           sclerophyll species. This may improve the habitat value of these areas for amphibians,
           although whether Wallum Frog species will be favoured will depend on the quality/pH of
           the groundwater.

Surface water Changes Impacts - Fauna:

      •  Changes to vegetation community composition and structure associated with increased
         surface water flows may affect the amenity or suitability of the habitat for breeding, foraging
         and dispersal by native fauna:
              o Localised waterlogging around HES Basin outlets and proliferation of water-
                 dependent native flora species (e.g. Melaleuca, sedges and ferns) will enhance the
                 amenity and suitability of these areas for amphibians and crayfish, however Wallum
                 Frog competitor species are likely to be favoured by the higher pH typical of surface
                 runoff.
        o The spread of weed species forming dense infestations (e.g. Para grass, Setaria
             grass, and Singapore daisy) around stormwater outlets is likely to intensify which will
             need to be managed through active and ongoing weed control operations.
      • Changes to soil chemistry and water quality associated with increased surface water flows
         may potentially alter the suitability of the heathland / wetland habitats for breeding by acid-
         specialist Wallum frogs, where the mixing of surface flows with groundwater has a diluting
         effect, resulting in higher pH.
      • Potential deleterious effects of nitrogen enrichment on amphibians and amphibian larvae
         if elevated concentrations (>10mg/L nitrate-nitrogen) are released, including:
              o Lethal effects (e.g. increased larval mortality); and
 Noosa Landfill & RRC – Response to RFI – Environmental Items (Dec 2023)                          Page|9

Page 10

               oSub-lethal effects (e.g. reduced size at metamorphosis; increased frequency of
                abnormalities; increased time to hatching or time to metamorphosis).
             o Aquatic ecosystem eutrophication which increases amphibian disease risk.
   •     A long term shift in amphibian community composition towards the more common/tolerant
         competitor species (Eastern Sedgefrog, Striped Rocketfrog and Beeping Froglet) may
         occur as a result of changes to soil chemistry/water quality.

Item 15 - A comprehensive Weed Management Plan for the site is been prepared which will
detail how the impact of invasive plants will be managed both in the short term through a
targeted eradication program and in the medium and long term through ongoing management
and monitoring of invasive species both on the Landfill site and in the retained natural;
vegetation areas adjacent to the facility.

Item 16 - Noosa Council is committed to delivering a Rehabilitation Offset Plan in accordance
with the Environmental Offsets Act 2014. Council will enter into an agreed delivery
arrangement to deliver this environmental offset. The Council proposed offset area is shown
in Figure 1.




Figure 1 – Proposed Offset Plant Area - NLRCC

The area selected for Offset works is within the Landfill facility in the south-eastern sector of the
site. It is noted that the proposed Offset area has undergone modification with swales and
channels created to manage water flows. These contours will be considered in the site
rehabilitation plan to ensure appropriate species selection consistent with the RE types 12.3.13
and 12.3.5. The large drainage channel which flows to the north is both topographically and
hydraulicly suited to a Melaleuca planting due to its low lying nature. The Scribbly gum species
which are present in the RE12.3.5 can be placed on the mounded areas on the top of the swales.

Noosa Landfill & RRC – Response to RFI – Environmental Items (Dec 2023)                       P a g e | 10

Page 11

Item 17 – A concept Offset Rehabilitation Plan will be provided at the Operational Works
application stage of the project. The following points regarding the proposed plan are noted:

A     The pre clear RE Mapping for the site indicates that the proposed Offset area contained
the mapped Regional Ecosystems 12.3.13 and 12.5.3. This is the same as the ecosystem been
cleared and is therefore considered to provide a suitable area to provide a like for like Offset
planting.

B     The clearing of 1.02ha remnant vegetation will result in the loss of approximately 500 non-
juvenile Koala habitat trees. The proposed Offset Rehabilitation plan will include provision for
1500 Koala habitat trees spaced at 3 metre centres. Additional plantings will include both mid
storey and groundcover species.

If you require any further information, please contact me on 0407 757 872.


Yours sincerely,




Simon McVerry
Director – Native Foresters




Noosa Landfill & RRC – Response to RFI – Environmental Items (Dec 2023)                   P a g e | 11

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.