Council archive · source document
Module 14 · OPW16/0098
Attached to the e-mail OPW16/0098 - Operational Works Application.
Response column key:
Achieved
14.1 Maritime safety state code P/S Performance solution
N/A Not applicable
Table 14.1.1: Operational work
Performance outcomes Acceptable outcomes Response Comment
Lighting
PO1 Development avoids lighting that AO1.1 Development must ensure that at all times, all N/A Structure not lit.
has the potential to interfere with aids to lights on or above the development site do not interfere
navigation. with safe navigation in surrounding waterways by:
(1) shielding lights to prevent glare or reflection
(2) avoiding flood lighting which may reduce the visibility
of aids to navigation
(3) avoiding flashing or flickering lights which may be
confused with aids to navigation
(4) avoiding coloured lights such as green, blue or red
lights, which may be confused with aids to navigation.
AND
AO1.2 Lighting complies with section 3 of AS 4282–1997 N/A
Control of the obtrusive effects of outdoor lighting.
Aids to navigation
PO2 Development does not interfere with AO2.1 Development must not interfere with any aid to Nearest sign is ~80m from the proposed structures.
aids to navigation. navigation on the development site.
AND
AO2.2 Development must not create any temporary or Nearest sign is ~80m from the proposed structures. No
permanent obstruction of aids to navigation. obstruction.
AND
AO2.3 Development must keep the sight line of any aids Nearest sign is ~80m from the proposed structures. Does
to navigation which cross the land clear of obstructions. not affect line of sight.
AND
AO2.4 Development must allow ongoing access to aids to Nearest sign is ~80m from the proposed structures. No
navigation for maintenance purposes. impact on access.
AND
AO2.5 Development does not result in significant Nearest sign is ~80m from the proposed structures. No
electrical or electro-magnetic emissions which may electro-magnetic emissions.
impede the operation of aids to navigation.
State development assessment provisions Module 14 — Maritime safety 14.1 Maritime safety state code
10 October 2014 V1.5 Page 1 of 3
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalFull text of the other 2 pages
Page 2
Performance outcomes Acceptable outcomes Response Comment
AND
AO2.6 Development: Nearest sign is ~80m from the proposed structures.
(1) is not within 40 metres of an existing aid to
navigation, or
(2) does not, within 40 metres of an existing aid to
navigation, remove any material that may destabilise
the aid to navigation (including ground tackle).
Protection of navigable waterways
PO3 Development does not encroach on AO3.1 Development is to be carried out in a manner that The proposed works are limited to the southern foreshore
the navigable waterway in a way that ensures the navigable waterway is open to vessel traffic directly adjacent to the channel. It does not extend into the
impedes the safe passage of vessels. at all times. deepest sections of the channel and will not limit vessel
Editor’s note: Where development proposes to temporarily or traffic.
permanently limit the depth of a navigable waterway or the size of
vessels which can navigate a waterway, it is recommended that a
vessel traffic management plan be provided. It is also While final construction equipment is yet to be determined, it
recommended a marine execution plan be submitted to the will be a requirement that the waterway remain accessible to
regional harbour master 30 days prior to the commencement of vessel traffic throughout the works.
works.
AND
AO3.2 Development: The structures are entirely within the proposed lot.
(1) does not extend beyond the quayline, or
(2) if there is no quayline, any structures that are part of
the development do not extend beyond that of
approved neighbouring structures.
AND
AO3.3 Development does not limit either the depth of a The proposed works are limited to the southern foreshore
navigable waterway or the size of vessels which can directly adjacent to the channel. It does not extend into the
safely navigate the waterway. deepest sections of the channel and will not limit the
Editor’s note: Where development closes or impedes vessel navigable depth of the channel or the size of the vessels
traffic in a navigable channel, the applicant must prepare a vessel which can safely navigate this section of waterway.
traffic management plan. It is also recommended a marine
execution plan be submitted to the Regional Harbour Master 30
days prior to the commencement of works.
AND
State development assessment provisions Module 14 — Maritime safety 14.1 Maritime safety state code
10 October 2014 V1.5 Page 2 of 3
Page 3
Performance outcomes Acceptable outcomes Response Comment
AO3.4 Development involving the demolition of structures N/A
in a navigable waterway, including piling, must ensure the
entire structure is removed.
AND
AO3.5 Structures, including all freestanding piles, must be P/S In accordance with advice from MSQ, Council will install an
appropriately lit and clearly visible to approaching vessels, “underwater obstruction” warning sign near HWM adjacent
and reflective tape must be fitted to all structures to to each of the proposed groynes.
enhance visibility during the hours of darkness.
Editor’s note: Where necessary, the Regional Harbour
Master may require the installation of aids to navigation on
structures.
PO4 Development does not adversely AO4.1 Development, including structures and any vessel N/A
affect navigable access to neighbouring berthed at the structures:
premises. (1) if the development involves a finger pontoon, boat
ramp or abuts a park or public area—has a setback
area that maintains a safe navigable access to
adjoining properties, or
(2) otherwise—retains a 1.5 metre setback from the
water allocation side boundaries.
State development assessment provisions Module 14 — Maritime safety 14.1 Maritime safety state code
10 October 2014 V1.5 Page 3 of 3
Used in these records
Module 14.pdfRelated documentApplication case desk ↗