Skip to the record
For the highest quality transcripts.

Council archive · source document

Module 14 · OPW16/0098

Attached to the e-mail OPW16/0098 - Operational Works Application.

of 3

Text shows just the words. Original shows the document exactly as it was published.

 Performance outcomes                      Acceptable outcomes                                             Response   Comment
                                           AO3.4 Development involving the demolition of structures        N/A
                                           in a navigable waterway, including piling, must ensure the
                                           entire structure is removed.

                                           AND

                                           AO3.5 Structures, including all freestanding piles, must be     P/S        In accordance with advice from MSQ, Council will install an
                                           appropriately lit and clearly visible to approaching vessels,              “underwater obstruction” warning sign near HWM adjacent
                                           and reflective tape must be fitted to all structures to                    to each of the proposed groynes.
                                           enhance visibility during the hours of darkness.
                                           Editor’s note: Where necessary, the Regional Harbour
                                           Master may require the installation of aids to navigation on
                                           structures.
 PO4 Development does not adversely        AO4.1 Development, including structures and any vessel          N/A
 affect navigable access to neighbouring   berthed at the structures:
 premises.                                 (1) if the development involves a finger pontoon, boat
                                               ramp or abuts a park or public area—has a setback
                                               area that maintains a safe navigable access to
                                               adjoining properties, or
                                           (2) otherwise—retains a 1.5 metre setback from the
                                               water allocation side boundaries.




State development assessment provisions                                      Module 14 — Maritime safety                                             14.1 Maritime safety state code
10 October 2014 V1.5                                                                                                                                                     Page 3 of 3

Used in these records

About this file

File size
136 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Module 14.pdf · 136 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.