Original source · versioned page text
ASTP-Rspns_To_RFI
Information Request Item No. Response
19-21. Vehicle Manoeuvring Please refer to the Engineer’s response letter in Attachment 3 and the revised Civil
The submitted plans do not include sufficient detail on the access driveway, the Engineering Plans in Attachment 2.
manoeuvring area and access into each proposed garage.
Information Required
19. Provide additional detail on the access driveway and the manoeuvring area.
The detail must be prepared by a suitably qualified person (RPEQ – Registered
Professional Engineer of Queensland) and include, but not be limited to:
a. a design generally in accordance with RS-049, RS-050 and any associated
addendum;
b. a longitudinal section extending from the centreline of the formation in
Coral Tree Avenue to driveway adjacent to the garages; and
c. demonstrate that a B99 vehicle will not bottom out of scrape while
entering/exiting the driveway.
20. Provide a Turning Path Plan that demonstrates how the driveway and
manoeuvring area will function. The plan must be prepared by a suitably
qualified person (RPEQ – Registered Professional Engineer of Queensland) and
include, but not be limited to:
a. demonstrate how a B99 vehicle, beginning and ending at the proposed
‘refuse area’, can enter and exit each garage while the proposed visitor
carpark is occupied; and
b. demonstrate how a B99 vehicle can enter and exit the visitor carpark while
both garages are occupied.
21. Provide comment from a suitably qualified person discussing what necessary
safety controls are to be implemented to ensure the sight lines from the road
frontage to the manoeuvring area remain unobstructed and to remove the
potential creation of traffic hazards between vehicles entering and exiting the
site simultaneously.
Our ref: 220417 Page 13 of 15
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the original