Original source · versioned page text
Statement of Landscape Intent
Attached to the e-mail Further information - MCU17/0551.
LEGEND
1 SITE BOUNDARY
2 NEIGHBOURING DEVELOPMENT
9 6 3 EARLIER STAGE(S) OF THIS DEVELOPMENT
B
(UNDER CONSTRUCTION)
4 INTERNAL ROAD
5 EASEMENT (TURFED)
6 PROPOSED RESIDENTIAL LOTS
7 BIORETENTION BASIN
5 8 MAINTENANCE ACCESS POINT TO BIORETENTION
9 9 STREET TREE PLANTING
10 SHADE TREE PLANTING
B
11 TRADING POST ROAD
12 MAIN ENTRY GATE TO DEVELOPMENT
4 1 1.2 m HIGH PERMEABLE FENCE
1.2 m HIGH POST AND 3 STRAND WIRE FENCE
KEYPLAN NTS
6 1.8 M HIGH COLORBOND FENCE
EXISTING 1.8 M HIGH FENCE
NORTH
2
STREET TREE PLANTING
KEY AREA PLAN NTS
INTERNAL ROAD
B
B
1 0 1 2 3 4 5
SCALE 1:100 @ A3 (metres) RESIDENTIAL RESIDENTIAL
LOT ROAD RESERVE LOT
STAGE 6 RESORT EXTENSION 22.11.17
STAGE 6 RESORT EXTENSION
AT
20 TRADING POST ROAD, COOROY 20 TRADING POST ROAD SECTION BB
FOR COOROY TYPICAL INTERNAL
PALM LAKE WORKS PTY LTD
B FOR ISSUE 22.11.17 STATEMENT OF
ROAD RESERVE
A FOR REVIEW 20.11.17
LANDSCAPE INTENT BVLD170501 L007 REV B
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.