Skip to the record
Search everything, all in one place.

Original source · versioned page text

Judgement - 11C Church Street

of 25

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

      Fencing to Protected Land
54.   A permanent fence must be constructed along the entire length of the interface of the
      site with the area to be dedicated for Environmental purposes. The fencing may be
      located at the top of the approved retaining walls and above the flood level. The fence
      must be constructed in accordance with an Operational Works approval and must be to
      the following specifications:
      a.          1.5 metres high
      b.          Dog proof
      Fauna Management
55.   Five (5) permanent artificial nesting boxes must be installed within the are to be
      dedicated for Environmental purposes to provide compensatory habitat for arboreal
      mammals and hollow dependent avian species. The works must be undertaken in
      accordance with an Operational Works approval.
      Bushfire Management
56.   The development must be carried out in accordance with the Bushfire mitigation report
      listed within this Decision Notice, with the exception of the following:
      a.          The report must be updated to refer to the correct unit numbers for future mitigation
                  requirements. To be clear Unit 13 is required to be changed to unit 10 throughout
                  the document.
      b.          Appendix 5.2 must be updated to include the final version of the site plans with the
                  correct number of units.
      The report must be resubmitted to Council incorporating the above amendments prior
      to the issue of any Development Permit for Operational Works.*
      *(Refer to Advisory Note)
57.   A copy of the Bushfire Mitigation Report listed within this Decision Notice must be
      provided to the nearest fire authority.
58.   Certification must be submitted to Council from a qualified person* which certifies that
      the development has been constructed in accordance with the bushfire management
      conditions of this Decision Notice.
      *(Refer to Advisory Note)
      NOISE
59.   Written certification is required from a suitably qualified person confirming that sound
      pressure levels from all mechanical plant and equipment comply with the following:
      a.          Air-conditioning
            i.       7am to 10pm: Maximum level allowable = background + 5dB(A)
           ii.       10pm to 7am: Maximum level allowable = background + 3dB(A)
      b.          Pumps
             i.      7am to 7pm: Maximum level allowable = background + 5dB(A)
            ii.      7pm to 10pm: Maximum level allowable = background + 3dB(A)
           iii.      10pm to 7am: No audible noise.
60.   The certification must be submitted to Council, which certifies that operational noise from
      any fixed plant and equipment complies and with the requirements of this Decision
      Notice.


                                                                                               6463731_1


                                                                                                           9
Log in to download the original file

Judgement - 11C Church Street.pdf · 8.5 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.