54. A permanent fence must be constructed along the entire length of the interface of the
site with the area to be dedicated for Environmental purposes. The fencing may be
located at the top of the approved retaining walls and above the flood level. The fence
must be constructed in accordance with an Operational Works approval and must be to
the following specifications:
a. 1.5 metres high
b. Dog proof
Fauna Management
55. Five (5) permanent artificial nesting boxes must be installed within the are to be
dedicated for Environmental purposes to provide compensatory habitat for arboreal
mammals and hollow dependent avian species. The works must be undertaken in
accordance with an Operational Works approval.
Bushfire Management
56. The development must be carried out in accordance with the Bushfire mitigation report
listed within this Decision Notice, with the exception of the following:
a. The report must be updated to refer to the correct unit numbers for future mitigation
requirements. To be clear Unit 13 is required to be changed to unit 10 throughout
the document.
b. Appendix 5.2 must be updated to include the final version of the site plans with the
correct number of units.
The report must be resubmitted to Council incorporating the above amendments prior
to the issue of any Development Permit for Operational Works.*
*(Refer to Advisory Note)
57. A copy of the Bushfire Mitigation Report listed within this Decision Notice must be
provided to the nearest fire authority.
58. Certification must be submitted to Council from a qualified person* which certifies that
the development has been constructed in accordance with the bushfire management
conditions of this Decision Notice.
*(Refer to Advisory Note)
NOISE
59. Written certification is required from a suitably qualified person confirming that sound
pressure levels from all mechanical plant and equipment comply with the following:
a. Air-conditioning
i. 7am to 10pm: Maximum level allowable = background + 5dB(A)
ii. 10pm to 7am: Maximum level allowable = background + 3dB(A)
b. Pumps
i. 7am to 7pm: Maximum level allowable = background + 5dB(A)
ii. 7pm to 10pm: Maximum level allowable = background + 3dB(A)
iii. 10pm to 7am: No audible noise.
60. The certification must be submitted to Council, which certifies that operational noise from
any fixed plant and equipment complies and with the requirements of this Decision
Notice.
6463731_1
9
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take up to a minute.