Judgement - 11C Church Street
WASTE DISPOSAL
61. The developer must provide waste storage and disposal facilities in accordance with
Planning Scheme Policy 9 - Waste Management. The facilities must include an
impervious area, within the site, correctly sized for all refuse and recycling containers
and suitably screened from public places and neighbouring properties. A bin wash area
is required with a cold-water tap, hose and drain outlet connected to sewer, via a bucket
trap. The drain outlet must be designed to prevent storm water entry to the sewerage
system.
62. Refuse containers must be provided in accordance with the requirements of the
Environmental Protection (Interim Waste) Regulation 1996 and (Waste Management)
Regulation 2000, for the storage and collection of refuse.
OPERATIONAL WORKS CONDITIONS
PRIOR TO COMMENCEMENT OF WORKS
1. A prestart meeting must be organised with Council’s delegate by calling 5329 6500
(giving at least five business days’ notice). The prestart meeting must be attended by
the responsible persons for:
a. Arboreal works.
b. Fauna management works.
c. Other relevant parties.
DURING CONSTRUCTION
Retention of Existing Trees and Vegetation
2. All vegetation clearing works are to be confined to the areas identified as cut and fill on
the Earthworks Layout Plan, plan number 184-001-200, revision D, dated 04.06.23 in
addition to the removal of all exotic species from the site.
3. A qualified person * must be engaged for the duration of the works to:
a. Oversee installation of all tree protection fencing prior to commencement of any
works onsite (including any clearing).
b. Supervise tree protection within the development site and frontages, prior to,
during and following construction in accordance with AS 4970, Protection of trees
on development sites.
c. Oversee approved tree removal in proximity to retained trees.
*(Refer to Advisory Note)
4. A qualified person* must be engaged to manage fauna prior and during clearing to:
a. Ensure works are carried out in accordance with the Nature Conservation Act
1992.
b. Undertake pre-clearing inspections including fauna relocation and removal or
blocking of all vacant hollows.
c. Ensure clearing works avoids nesting times of animals and birds.
d. Co-ordinate staging and sequence of clearing with fauna protection.
6463731_1
10
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take up to a minute.