      Co-ordination of Operational Works Assessment
11.   Additional application fees apply to Operational Work applications where the different
      aspects of the works are lodged separately. Significant savings in application fees will
      result if all works are lodged in a single application.
      Preparation of a Preliminary Construction Management Plan
12.   A preliminary Construction Management Plan must be submitted with the Operational
      Works application and must address the following:
      a.   traffic management during all aspects of the construction phase including:
           i.     a Traffic Management Control Plan in accordance with the Manual of
                  Uniform Traffic Control Devices (MUTCD) detailing all temporary signage
                  and traffic control measures prior to construction
           ii.    maintenance of safe vehicle and pedestrian access for the areas affected by
                  the works during and after daily construction has ceased
           iii.   proposed fencing to the site during the construction phase of the
                  development
           iv.    approval of the Traffic Management Control Plan by the Department of
                  Transport and Main Roads (DTMR) for any works on State controlled roads
           v.     provision for worker car parking
      b.   maintenance and protection of water quality and existing drainage lines through
           the construction site, through the implementation of appropriate erosion and
           sediment control measures
      c.   works programme identifying key components of the works and their respective
           durations
      d.   establishment of a communication protocol with the general public, adjoining
           owners, emergency services and local businesses to advise of agreed
           construction times, impacts on traffic, services and other relevant issues.
      e.   Include a post out to the local residents and businesses advising of the proposed
           development, the expected time frames and the site contact details.
      f.   Include signage in prominent locations on the boundaries of the site advising of
           the proposed development, the expected time frames and the site contact details.
      g.   identification of complaint management procedures including:
           i.     contact details for the on-site manager
           ii.    dispute resolution procedures
      h.   details on the location of external fill/dump sites/sources, the haulage route, type
           of vehicle to be utilised during filling operations and frequency of usage. NB any
           damage to the existing road system as a result of haulage operations shall be fully
           repaired at the applicant’s expense
      i.   it is acknowledged that the preliminary Construction Management Plan will be a
           draft document requiring finalisation upon appointment of the Principal Contractor
           employed to construct the works and a final document will be required to be
           submitted at the Pre-Start Meeting for the project.
      Private Infrastructure
13.   All private infrastructure for the development must be designed to meet the planning
      scheme requirements unless otherwise agreed by the relevant authority.



                                                                                       6463731_1


                                                                                                   13
Log in to download the original file

Judgement - 11C Church Street.pdf · 8.5 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.